A6.P1 (cdb probe spike) + A6.P2 (analysis report) both SHIPPED this session. Updated: docs/plans/2026-04-11-roadmap.md — M1.5 phase block now shows A6.P1 + A6.P2 SHIPPED with commit refs; A6.P3 entry expanded with the Finding-2-first sequencing recommendation from A6.P2; A6.P4 entry notes the original "Holtburg Sewer end-to-end" acceptance walk is unreachable (sewer doesn't exist). docs/plans/2026-05-12-milestones.md — M1.5 demo scenario split into building/cellar half (achievable post-A6.P3) + dungeon half (blocked on issue #95 visibility blowup; promote to post-M1.5 if #95 isn't fixed in scope). Issue list updated: added #95 + indoor sling-out (new from scen4); marked stairs/2nd-floor/cellar as characterized by A6.P2 Finding 2 family. CLAUDE.md — Currently-working-toward block now points at A6.P3 as the active phase. A6.P1 + A6.P2 ship noted with the findings doc pointer. Demo-scenario note updated to reflect the sewer + #95 reality. Issues-in-scope updated. Also includes a 1-line trailing-prompt addition to scen3 + scen4 retail.log files (cdb wrote one more `0:000>` after the kill that landed after the original capture commits). Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| .gitkeep | ||
| acdream.log | ||
| retail.decoded.log | ||
| retail.log | ||