Erik
aa734f3409
docs: R5 arc close-out — V5 facade shipped, arc DONE; M1.5 critical path next
- r5-wiring-handoff.md: arc close-out banner (V1-V5 trail, relay/anchor
inventory, carried follow-ons #167 / R6 TS-42 / TS-43)
- roadmap: R5 ledger entry completed through V5 (incl. the #170/#171/V4
gate history that had only lived in memory/handoffs)
- milestones: the interleaved parity-track note — R5 arc DONE 2026-07-05
- CLAUDE.md Current state: R5 arc DONE; next work = M1.5 critical path
(#137 dungeon collision, #138 teleport-OUT, A7 dungeon lighting)
- pickup prompt marked DONE
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>