acdream/docs/superpowers
Erik 1e9485532f docs: plan progress — Tasks 1+3 done (outdoor node + outdoor-root flood validated)
Foundation shipped + validated: the flood roots at the outdoor node and reaches
buildings with ZERO production changes (the design's central risk is resolved).
Next = Task 2 + Phase 3 cutover together, inline (contextual GameWindow surgery
ending at the visual gate).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-07 18:26:09 +02:00
..
plans docs: plan progress — Tasks 1+3 done (outdoor node + outdoor-root flood validated) 2026-06-07 18:26:09 +02:00
specs docs: spec — render unification (outdoor-as-a-cell, single DrawInside path) 2026-06-07 18:07:33 +02:00