Foundation shipped + validated: the flood roots at the outdoor node and reaches buildings with ZERO production changes (the design's central risk is resolved). Next = Task 2 + Phase 3 cutover together, inline (contextual GameWindow surgery ending at the visual gate). Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| architecture | ||
| audit | ||
| plans | ||
| research | ||
| superpowers | ||
| bugs.md | ||
| ISSUES.md | ||