Roadmap:
- Status header now reads "Between phases" with C.1.5b in the recent-wins
bullet list.
- New SHIPPED row in the table (C.1.5b) summarising both slices, the
reality discovery about EnvCell statics, and the 4 visual-verified sites.
- The "IN FLIGHT — C.1.5b" sub-bullet under Phase C flipped to SHIPPED.
ISSUES.md:
- #56 removed from Active.
- #56 added to Recently closed with full commit chain (1e3c33b spec+plan,
f3bc15e SetupPartTransforms helper, 11521f4 ParticleHookSink part-transform,
5ca5827 activator refactor, 8735c39 GpuWorldState fire-sites), resolution
notes, and the visual-verification record.
CLAUDE.md:
- "Currently in flight" pointer replaced by a "Currently between phases"
marker + a C.1.5b shipped paragraph that's parallel to the existing
C.1.5a entry.
- "After C.1.5b" → "Next phase candidates".
Visual verification 2026-05-12: portal swirl matches retail extent + lateral
spread (no ground-burial); Holtburg Inn fireplace flames; cottage chimney
smoke; spell-cast particles on +Acdream — all match retail.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>