acdream/tests
Erik c601942467 wip: Campaign LA LA2 probe mode + idle policy — INCOMPLETE, stopped mid-task
Agent was stopped for token budget. Landed here: probe flag through
LiveSessionConnectOptions + the StartCore short-circuit, the mode field
with JsonRequired-to-semantic-validation move, host exit-code mapping,
and 34 passing tests including 3 new probe tests (agent last reported
green before the stop). NOT DONE: the idle-policy unit tests (next
step), full-suite verification, and the WSL run.

Build/test state UNVERIFIED at this commit. Next session: finish idle
policy tests, run Runtime+Headless Release suites Windows and WSL, then
dispatch the Opus dual-lens review.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-14 16:33:00 +02:00
..
AcDream.App.Tests docs: Campaign LA — pinned launch-contract schema COMMITTED into plan LA1 2026-08-14 16:04:32 +02:00
AcDream.Bake.Tests feat(content): bake and read flat collision assets 2026-07-25 15:22:08 +02:00
AcDream.Cli.Tests perf(diag): complete trustworthy Slice A capture tooling 2026-07-24 12:46:51 +02:00
AcDream.Content.Tests fix(physics): S2 — static publication emits authored Spheres as Spheres (AP-155 narrowed) 2026-08-07 08:07:02 +02:00
AcDream.Core.Net.Tests fix(net): Campaign LA LA7a review fixes — AD-97 register row, corrected restore justification 2026-08-14 16:01:52 +02:00
AcDream.Core.Tests fix: social gate round 2, part 2 - confirmation-dialog sentences + the 2026-08-13 21:10:42 +02:00
AcDream.Core.Tests.Fixtures.HelloPlugin feat(core): add PluginLoader with collectible ALC 2026-04-10 09:51:16 +02:00
AcDream.Headless.Tests wip: Campaign LA LA2 probe mode + idle policy — INCOMPLETE, stopped mid-task 2026-08-14 16:33:00 +02:00
AcDream.Platform.Tests fix(platform): Campaign LA LA0 review fixes — CI Linux lanes, arch doc, self-guard 2026-08-14 15:30:04 +02:00
AcDream.Runtime.Tests wip: Campaign LA LA2 probe mode + idle policy — INCOMPLETE, stopped mid-task 2026-08-14 16:33:00 +02:00
AcDream.UI.Abstractions.Tests fix #389 review round: settings v3 FOV migration + live apply; AD-90 2026-08-13 17:27:15 +02:00
Fixtures/campaign-la docs: Campaign LA — pinned launch-contract schema COMMITTED into plan LA1 2026-08-14 16:04:32 +02:00