acdream/docs
Erik 3e9ff7accb docs(research): A8 RR7 reverted — full WB-port handoff for next session
Four RR7 variants shipped + reverted in one session (RR7, RR7.1, RR7.2,
RR7.3). The root architectural mismatch: RR7 routed cell-mesh rendering
through ObjectMeshManager / WbDrawDispatcher.Draw(IndoorPass) — a per-
GfxObj batched pipeline. WB uses a separate EnvCellRenderManager (862
LOC) for cells; we never extracted it. Indoor branch fires correctly
after RR7.2 + RR7.3 but interior cell geometry doesn't render.

User direction (verbatim, 2026-05-27): port WB verbatim. No band-aids.
Visual test launch only when fix is ready; probe data verified first.

Handoff captures:
- Session log of all four RR7 attempts + why each failed
- Why WB over retail (modern GL fit + existing Phase N.4/N.5/O
  commitment to WB as rendering base)
- The full WB RenderInsideOut algorithm spec (Steps 1-5, line refs)
- 5-phase next-session plan (extract EnvCellRenderManager + deps,
  wire into landblock load, replicate RenderInsideOut byte-for-byte,
  probe trail mandatory before visual gate, single visual gate)
- Process rules carved from this session's mistakes (no visual gate
  without probe data first, no partial WB ports, no conceptual
  adaptations, trust-but-verify, slow at brainstorm not implement)

RR3-RR6 infrastructure remains shipped + tested in isolation
(Building/Registry/Loader/Dispatcher cellIds overload/Stencil pipeline).
Branch is at pre-A8 visual ("looks good") with infrastructure dormant.

Next session opens cold against the pickup prompt at the bottom of
the handoff doc.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-27 14:10:33 +02:00
..
architecture ship(O): Phase O — DatPath Unification — SHIPPED 2026-05-21 17:41:15 +02:00
audit docs: update audit — Sprint 1 items verified (sequence counters + scenery LCG) 2026-04-13 13:51:39 +02:00
plans ship(phys): A6.P3 slice 3 — cell-resolver ping-pong CLOSED + #98 re-diagnosed 2026-05-22 12:11:56 +02:00
research docs(research): A8 RR7 reverted — full WB-port handoff for next session 2026-05-27 14:10:33 +02:00
superpowers docs: Phase A8 — mark prior restructure design+plan as SUPERSEDED 2026-05-27 10:08:48 +02:00
bugs.md docs: update bugs.md — close BUG-002/003/004, add BUG-005/006/007 2026-04-14 12:17:31 +02:00
ISSUES.md docs: #100 ship + indoor-cell culling investigation handoff 2026-05-25 22:17:51 +02:00