Commit graph

2 commits

Author SHA1 Message Date
Erik
2950cd5740 docs: rewrite handoff — M2 redirected from "kill a drudge" to indoor walkability
User chose fundamentals-first after M1 landed: indoor walking is
untested (M1 only verified outdoor + doorway), indoor lighting is
broken, camera clips into walls indoors. Better to fix indoor
foundations before stacking combat on top.

Three sub-phases proposed for the new M2:
  1. Camera correctness (~1 day)
  2. Indoor collision audit (~1 week)
  3. Indoor lighting basics (~1-2 weeks)

Combat ("Kill a drudge") slides to M3.

Next session opens with superpowers:brainstorming to scope the
demo scenario + agree on sub-phase boundaries + update the
milestones doc + CLAUDE.md to formalize the reorder.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-16 21:01:30 +02:00
Erik
5d79dd3b88 docs: session handoff 2026-05-16
Captures M1 landing, Phase B.6 architectural details, new rules
(no-workarounds, no-demo-videos, graceful-shutdown), M2 next steps,
and test baselines for fresh-session pickup.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-16 17:53:11 +02:00