f9bab501df docs(research): Phase A8 RR0 — Issues A + C caused by R3, NOT pre-existing
Three-branch falsification spike per the design's RR0:

  HEAD (2bfeafd, R3.5 v2):     Issue C YES; Issue A YES (varies by building)
  R3 baseline (60f07bc):        Issue C YES; Issue A YES (same as HEAD)
  main (7034be9, no A8 work):   Issue C NO; Issue A NO flicker; BUT
                                 constant #78 symptom (houses-below-terrain
                                 visible from inside)

Diagnosis: R3 (stencil pipeline wire-in) successfully fixes the original
#78 main symptom but introduces Issues A and C as new transition artifacts.
R3.5 v1+v2 patches didn't help (R3 baseline shows same A+C as HEAD).

Per the design's decision gate (Outcome 2): PAUSE plan; re-brainstorm
via superpowers:brainstorming to address A+C without re-introducing #78
constant leak.

The original restructure design assumed A+C might be pre-existing and
could be filed as separate out-of-A8-scope issues. RR0 invalidates that.
The restructure must address them OR the brainstorm needs a third option
between "stencil-gate everything" (causes A+C) and "no stencil work"
(causes #78).

Open questions for the re-brainstorm captured in the findings doc.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>