Commit graph

1 commit

Author SHA1 Message Date
Erik
b70b9832ff docs: capture the post-Campaign-V work intake, sorted
Twelve user-provided forward items sorted into three buckets: three land on already-staged work (equipped-child picking and vendor slices are the world-interaction program's own next steps; the Settings tab is the filed V11 dev-panels follow-up), three are verification campaigns whose research already exists (property-enum divergence doc, wire-message catalog, the retail physics workflow - starting with the observed long-jump landing bounce), and six are new feature bodies for milestone sequencing (login/char creation, summoning, fellowship/allegiance tabs, in-game map, chat color/text fidelity from the cdb-captured retail values, missing slash commands). Intake ledger only; sequencing happens in the roadmap after V11 closes.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-29 00:30:01 +02:00