Erik
|
e4f3f6bfab
|
docs(plans): Phase B.3 Complete — movement + world navigation plan
7-task plan: PortalPlane math, PhysicsEngine portal transitions,
populate portals from streaming, jump+gravity+falling,
portal-space state machine, Setup.StepUpHeight + scenery road fix,
and visual verification with 12 acceptance criteria.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
|
2026-04-12 15:59:29 +02:00 |
|