User chose fundamentals-first after M1 landed: indoor walking is
untested (M1 only verified outdoor + doorway), indoor lighting is
broken, camera clips into walls indoors. Better to fix indoor
foundations before stacking combat on top.
Three sub-phases proposed for the new M2:
1. Camera correctness (~1 day)
2. Indoor collision audit (~1 week)
3. Indoor lighting basics (~1-2 weeks)
Combat ("Kill a drudge") slides to M3.
Next session opens with superpowers:brainstorming to scope the
demo scenario + agree on sub-phase boundaries + update the
milestones doc + CLAUDE.md to formalize the reorder.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Captures M1 landing, Phase B.6 architectural details, new rules
(no-workarounds, no-demo-videos, graceful-shutdown), M2 next steps,
and test baselines for fresh-session pickup.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>