0d62a5ffeb docs: close the placement cutover ledger — #280 user-passed, remaining gates NOT RUN
Campaign closed by user direction after the #280 connected gate passed.

GATE RESULT. #280 user-accepted: "now portal space takes longer but terrain is
complete when I exit" — both halves of the specified criteria, a measurably
longer hold and a complete destination on reveal. Probe evidence: three Portal
reveals plus a Login reveal, every one at radius=12 where pre-fix it was a
hardcoded 1, each portal hold raising the wait cue at ~5.0 s before completing.

An accidental but genuine A/B came out of the same session. An earlier run set
ACDREAM_PROBE_REVEAL_RADIUS=1 — that variable is a radius VALUE, not an on/off
flag — which forced the pre-fix window. The user saw the original defect under
it and not under radius=12. That is the before/after pair the gate asked for,
obtained by mistake. Recorded prominently because the same mistake would
silently reproduce the bug for the next person.

WHAT IS NOT CLAIMED. The ledger closes with most connected gates outstanding
BY USER DIRECTION, not because they were discharged: D-1's two reachability
scenarios, AP-136's six-step park protocol, route-7 thickening (the
remote-teleport probe recorded ZERO lines), the two-client observation, the
nine-stop soak, and the lifecycle/reconnect route. The closeout's section 2.6
is a table of exactly this, and both the campaign plan banner and this commit
say that anyone citing "the campaign passed" must cite it alongside.

THE PROBE FAMILY IS DELIBERATELY NOT STRIPPED. Closing the campaign would
normally retire the six ACDREAM_PROBE_* flags, but their gates were never run,
and stripping now would delete precisely the instrumentation those owed gates
need — the failure the handoff's own rule exists to prevent. Honouring that
rule means not stripping even though the campaign is closing.
ACDREAM_PROBE_REVEAL_RADIUS is also kept despite #280 closing, because AP-149
and #326 are open and would both want the same A/B harness.

#280 is marked CLOSED in ISSUES with its gate evidence, and its residual
AP-149 is restated there: our outer ring accepts terrain-only readiness where
retail's PreFetchCells also requires each landblock's LandBlockInfo and every
building's EnvCells, so distant SCENERY may still fill in after reveal even
though terrain does not. Not folded in — it costs further hold time and is a
game-feel call.

Memory updated with the campaign's closed state and the follow-up order:
#331 first, then AP-152, #330, AD-65.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-08-06 11:05:49 +02:00
Erik
1304dafa8b docs: C5c closeout + successor handoff; automated gate passes 11,196/4/0
Closes the automated half of C5c. Everything still owed needs the user at a
live client, and the probe strip cannot precede it.

AUTOMATED GATE — PASS. Complete Release suite on the final binary at
7b3e2895, run after deleting all 44 bin/obj directories rather than trusting
a rebuild flag: 11,196 passed / 4 skipped / 0 failed across all nine
projects. The clean-build precaution is not ceremony — this session had three
incidents of a runner serving a DLL that still contained deleted code, one of
them under -t:Rebuild. Campaign net: 11,106 at 02578441 -> 11,196, +90, with
no new skip anywhere and none of #302/#308/#321 firing.

STATE. Every implementation item in the placement cutover is landed and
dual-reviewed: C5b, #280, #276's remainder, AP-22 and AD-10, all with both
lenses PASS. #309 was accepted as a standing divergence by user decision
rather than fixed. What remains is connected/visual work plus the ledger
close.

WHAT THE HANDOFF CARRIES that a reader would otherwise have to rediscover:

- The connected gates owed, with the detail that matters — #280's route needs
  a LIFESTONE leg because the original repro was a recall, not a /teleloc;
  D-1's two reachability scenarios have never been reproduced live; and
  AP-136's six-step park check SURVIVES #309's deferral because it validates
  the shipped rollback path, not the deferred fix. Strip the probes after
  those, never before.
- Twelve issues filed (#321-#332). #331 is flagged first: its discriminator
  turned out to be the `body:` parameter rather than the fixture, it
  reproduces under the local player's own call profile on ramps as shallow as
  1.1 degrees, and nothing in the suite asserts uphill progress on a walkable
  slope — the test that found it passed vacuously.
- Register movement, including AD-65's corrected magnitude (25%/50%, not
  13%/29% — the row stated cos^2 and quantified 1-cos) and why that matters:
  it is a live lead for #269, and #269's existing do-not-retry covers friction
  and jump chains, not AdjustOffset.
- The bisect hazard from the C4 handoff, carried forward verbatim.
- Nine process findings stated as rules, each paid for this session. The two
  that cost the most: a blast-radius survey only reaches as far as the call
  graph its author walked (C5b missed an entire host with 11,000 tests
  green), and a test is not evidence until sabotage proves it discriminates
  (seven green-but-empty tests found or avoided).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>