Commit graph

2 commits

Author SHA1 Message Date
Erik
1662da8731 test(p0): threshold-trace golden wiring + PVS scaffold + P1-entry checklist
P0 Tasks 6 (autonomous half) + 7. FindCellList_DoorwayThreshold_MatchesRetailTrace
asserts acdream's pick == each captured retail pick; skips until the capture
fixture lands. PvsConformanceTests scaffolds the render visible-set golden
(skipped; filled in P4). ConformanceDats.FixturesDir resolves fixtures from the
source tree (issue98 pattern). Notes record: existing retail traces are
collision-only (no membership) so the strict P1 gate needs the one live capture;
plus the P1 re-scope finding (Stage-1 membership already on this branch).

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-03 14:29:30 +02:00
Erik
a90f34368f test(p0): dat-backed conformance loader + characterized cottage-doorway topology
P0 (verbatim-spatial-pipeline-port) Tasks 1+2. ConformanceDats loads the
cottage-doorway cells from the real dats with their real ContainmentBsp;
CottageDoorwayCharacterizationTests maps the Holtburg 0140..017F indoor
neighborhood and pins the master-plan threshold building (origin
161.93,7.50,94.00): 0xA9B40170 vestibule (exit portal 0xFFFF + portal to
0171), 0xA9B40171 room. Grid math confirms the outdoor side is landcell
0xA9B40031 -> the 0031<->0170<->0171 ping-pong is verified real. Verified
interior points recorded for the point_in_cell/find_cell_list goldens.

Plan: docs/superpowers/plans/2026-06-03-p0-conformance-apparatus.md
Notes: docs/research/2026-06-03-p0-conformance-apparatus-notes.md

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-03 14:20:17 +02:00