Erik
6010827b21 docs: roadmap N.0 shipped + realistic N.2-N.9 estimates + N.3 handoff
Roadmap updates after Phase N.1 ship:
- Marks N.0 (submodule + project refs setup) as ✓ SHIPPED with the
  c8782c9 commit reference
- Updates N.2-N.9 effort estimates with realistic post-N.1 numbers
  (originals were 1-2 days / 1 week / 2 weeks; realistic numbers
  factor in conformance-test discovery, ACME-vs-Chorizite delta
  hunts, and the visual-verification-then-revert cycle that ate
  most of N.1's calendar time)
- Adds a "Lessons from N.1" subsection so future N phases benefit
  from the rotation-bug-conformance-test pattern, the ACME divergence
  insight, and the "whackamole = stop" rule
- Updates total calendar estimate to 3-4 months / 10-12 engineering
  weeks for N.2-N.9 (was 2-3 months / 6-8 weeks)

New handoff doc at docs/research/2026-05-08-phase-n3-handoff.md
captures everything a fresh agent picking up N.3 (texture decoding)
needs: phase context, what to read first, suggested task decomposition,
watchouts (especially the ACME-divergence and conformance-test
lessons), and where to start.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-08 10:49:16 +02:00