docs(overhaul): record S5 c1 mandatory stop
This commit is contained in:
parent
88873ea3dc
commit
efb0756190
2 changed files with 46 additions and 3 deletions
|
|
@ -1,6 +1,6 @@
|
|||
# Campaign OVERHAUL v2 — S5 consumers, material, and closeout packet
|
||||
|
||||
**Status:** S5-c1 CONTRACTED 2026-09-04; implementation not yet landed.
|
||||
**Status:** S5-c1 STOPPED 2026-09-04 after fix round 2; not landed.
|
||||
**Branch:** `claude/campaign-w-retail-frame-walk`.
|
||||
**Gate:** G4 remains unpassed. Nothing merges to `main` before G4.
|
||||
|
||||
|
|
@ -274,3 +274,46 @@ row and do not change the three AP-241/AP-242/AP-243 assertions. Run the exact
|
|||
failed test first, then a fresh official hermetic lane under a new artifact
|
||||
name and the required InstalledDat lane. Preserve the original failed artifact
|
||||
and record both identities in the implementer return.
|
||||
|
||||
## 9. S5-c1 mandatory stop after fix round 2 — 2026-09-04
|
||||
|
||||
The reviewed scratch stack is intentionally **not landed**:
|
||||
|
||||
- gate-correction contract `2bb565b0b`;
|
||||
- implementation `9aadc917a`;
|
||||
- retail fix-round-1 contract/implementation `afaebcad6` / `74a2e4c48`;
|
||||
- retail fix-round-2 contract/implementation `ed8200664` / `a28384d80`.
|
||||
|
||||
The retail lens ultimately passed. It verified the paired executable/PDB bytes,
|
||||
the exact land-cell versus EnvCell virtual behavior, previous-completed-frame
|
||||
timing, x87/AP-116 edges, typed landscape handoff, and unchanged particle
|
||||
draw/queue/tick behavior. The production lens found no production-code or test
|
||||
defect and reproduced Release 0 warnings / 0 errors, Core VFX 111/111, App
|
||||
focused 146/146, allocation 1/1 at 0 B, AP-116 3/3, all six non-vacuous
|
||||
mutations, all source guards, and all three 30-entry artifact manifests with
|
||||
zero mismatch. Official artifacts remain in the scratch worktree:
|
||||
|
||||
- `artifacts/s5-c1-hermetic-20260904`: 16,759 passed / 1 stale-row failure;
|
||||
- `artifacts/s5-c1-hermetic-corrected-20260904`: 16,760/16,760;
|
||||
- `artifacts/s5-c1-installed-20260904`: 385 passed / 10 documented failed /
|
||||
1 documented skipped, with no new identity.
|
||||
|
||||
The final production lens nevertheless failed on two correction-worthy
|
||||
documentation/evidence findings after both allowed fix rounds:
|
||||
|
||||
1. `acdream-architecture.md` and AD-21 say a null-root frame publishes no
|
||||
cell-visibility answer. Production actually completes
|
||||
`hasCompletedView=true` with an empty landscape set; only login/portal carry
|
||||
false. Scratch packet §11.1 states this correctly, so the implementation's
|
||||
claim that architecture/register prose is truthful is false.
|
||||
2. The packet reports the official lanes but does not reconcile their recorded
|
||||
`WorktreeDirty=true` bases (`00f134f9e` for the first lane and `2bb565b0b`
|
||||
for the corrected/InstalledDat lanes) to implementation commit `9aadc917a`,
|
||||
nor state that later commits are prose/comments only. The manifests prove
|
||||
their 30 recorded evidence files, not the dirty source content.
|
||||
|
||||
Correcting either finding would be fix round 3. The campaign rule therefore
|
||||
requires this stop: do not cherry-pick the scratch stack, do not run a graphical
|
||||
gate on it, and do not dispatch S5-c2. Resumption requires explicit owner
|
||||
direction on whether to authorize an evidence/documentation-only exception;
|
||||
history must remain intact either way. G3 stays provisional and G4 unpassed.
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue