docs: R5 arc close-out — V5 facade shipped, arc DONE; M1.5 critical path next

- r5-wiring-handoff.md: arc close-out banner (V1-V5 trail, relay/anchor
  inventory, carried follow-ons #167 / R6 TS-42 / TS-43)
- roadmap: R5 ledger entry completed through V5 (incl. the #170/#171/V4
  gate history that had only lived in memory/handoffs)
- milestones: the interleaved parity-track note — R5 arc DONE 2026-07-05
- CLAUDE.md Current state: R5 arc DONE; next work = M1.5 critical path
  (#137 dungeon collision, #138 teleport-OUT, A7 dungeon lighting)
- pickup prompt marked DONE

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
Erik 2026-07-05 11:12:37 +02:00
parent dccd700991
commit aa734f3409
5 changed files with 75 additions and 18 deletions

View file

@ -109,14 +109,15 @@ movement queries.
## Current state
**Currently working toward: M1.5 — Indoor world feels right** (building/cellar demo
DONE + gated; REMAINING: **A7 dungeon lighting** #79/#93, **#137 dungeon collision**,
**#138 teleport-OUT**). Two **user-report-driven parity tracks** interleave with it at
the issue level (reconciled 2026-07-04 — they are NOT milestones; see the M1.5 note in
the milestones doc): **D.2b retail UI** (next: container-switching —
`claude-memory/project_d2b_retail_ui.md`) and the **R5 movement-manager arc**
(#170/#171 + R5-V3 CLOSED + gated 2026-07-04; next: **R5-V4** capstone —
`docs/research/2026-07-03-r5-managers/r5-wiring-handoff.md`). M2 (CombatMath)
deferred. Keep this paragraph ≤6 lines + pointers — detail in the docs below, NOT here.
DONE + gated; REMAINING = the critical path: **#137 dungeon collision**,
**#138 teleport-OUT**, **A7 dungeon lighting** #79/#93). One **user-report-driven
parity track** still interleaves at the issue level (NOT a milestone; see the M1.5
note in the milestones doc): **D.2b retail UI** (next: container-switching —
`claude-memory/project_d2b_retail_ui.md`). The **R5 movement-manager arc is DONE**
(2026-07-05, V5 facade shipped; close-out banner in
`docs/research/2026-07-03-r5-managers/r5-wiring-handoff.md`; carried: #167, R6/TS-42).
M2 (CombatMath) deferred. Keep this paragraph ≤6 lines + pointers — detail in the docs
below, NOT here.
For canonical state, read in this order:
- [`docs/plans/2026-05-12-milestones.md`](docs/plans/2026-05-12-milestones.md) — milestone targets + freeze list per milestone