docs: stamp the port plan with end-of-day execution status (BR-2..6 code-complete, BR-7 + T5 remaining)

Doc-and-reality sync before the session handoff: the plan's phase
sections read future-tense while T1-T4 landed them. The render digest
carries the authoritative ledger; this stamp points there and names the
4 pre-existing #99-era Core failures as BR-7's built-in acceptance
signal.
This commit is contained in:
Erik 2026-06-11 13:23:28 +02:00
parent 4a307d33b5
commit 85fe20f51d

View file

@ -1,5 +1,15 @@
# The holistic building-render port plan (Phase B) — one drawing discipline
**EXECUTION STATUS (2026-06-11 end of day): BR-2…BR-6 are CODE-COMPLETE on
the branch (HEAD `4a307d3`), executed as the fused tasks T1T4 — see the
render digest's ledger for the per-commit map (T1 `579c8b0` frame order;
T2 `cf8a2c3`/`529dfcf`/`88f3ce1` flood fidelity, two retail constants refuted
by the conformance gate and kept at documented tolerances; T3 `a6aec8c`
viewconeCheck; T4 `4a307d3` one-gate deletions). REMAINING: BR-7 (T6,
collision A6.P4) → then T5, the single comprehensive visual gate. The 4
pre-existing #99-era Core test failures double as BR-7's built-in
acceptance signal (they should flip green as A6.P4 lands).**
**Status: APPROVED + AMENDED (2026-06-11). EXECUTION DIRECTIVE CHANGED BY THE
USER: "I don't care if it is non-playable… I want everything ported, then we
test."** The per-phase playability constraint and per-phase user visual gates