docs: stamp the port plan with end-of-day execution status (BR-2..6 code-complete, BR-7 + T5 remaining)
Doc-and-reality sync before the session handoff: the plan's phase sections read future-tense while T1-T4 landed them. The render digest carries the authoritative ledger; this stamp points there and names the 4 pre-existing #99-era Core failures as BR-7's built-in acceptance signal.
This commit is contained in:
parent
4a307d33b5
commit
85fe20f51d
1 changed files with 10 additions and 0 deletions
|
|
@ -1,5 +1,15 @@
|
|||
# The holistic building-render port plan (Phase B) — one drawing discipline
|
||||
|
||||
**EXECUTION STATUS (2026-06-11 end of day): BR-2…BR-6 are CODE-COMPLETE on
|
||||
the branch (HEAD `4a307d3`), executed as the fused tasks T1–T4 — see the
|
||||
render digest's ledger for the per-commit map (T1 `579c8b0` frame order;
|
||||
T2 `cf8a2c3`/`529dfcf`/`88f3ce1` flood fidelity, two retail constants refuted
|
||||
by the conformance gate and kept at documented tolerances; T3 `a6aec8c`
|
||||
viewconeCheck; T4 `4a307d3` one-gate deletions). REMAINING: BR-7 (T6,
|
||||
collision A6.P4) → then T5, the single comprehensive visual gate. The 4
|
||||
pre-existing #99-era Core test failures double as BR-7's built-in
|
||||
acceptance signal (they should flip green as A6.P4 lands).**
|
||||
|
||||
**Status: APPROVED + AMENDED (2026-06-11). EXECUTION DIRECTIVE CHANGED BY THE
|
||||
USER: "I don't care if it is non-playable… I want everything ported, then we
|
||||
test."** The per-phase playability constraint and per-phase user visual gates
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue