docs(overhaul): refresh S5 c3 packet status

This commit is contained in:
Erik 2026-09-04 21:15:59 +02:00
parent e18e23a5d3
commit 5cc437bf98

View file

@ -1,7 +1,8 @@
# Campaign OVERHAUL v2 — S5 consumers, material, and closeout packet # Campaign OVERHAUL v2 — S5 consumers, material, and closeout packet
**Status:** S5-c1 and S5-c2 LANDED + lead graphical gates PROVISIONAL PASS; **Status:** S5-c1 and S5-c2 LANDED + lead graphical gates PROVISIONAL PASS;
S5-c3 CONTRACTED 2026-09-04, implementation pending. S5-c3 implemented in scratch, retail review 1 FAIL, bounded fix round 1 in
progress under §18.
**Branch:** `claude/campaign-w-retail-frame-walk`. **Branch:** `claude/campaign-w-retail-frame-walk`.
**Gate:** G4 remains unpassed. Nothing merges to `main` before G4. **Gate:** G4 remains unpassed. Nothing merges to `main` before G4.