acdream/docs/superpowers
Erik 18a2e28875 docs(plan): Indoor walking Phase 1 — BSP cluster implementation plan
14-task plan covering the diagnostic-driven phase: probe + capture +
three fix commits + docs. Tasks 1-6 land the [indoor-bsp] probe in
one feature commit. Task 7 is the user-run capture gate. Tasks 8-11
do post-capture diagnosis + fix for #84 and #85 (with a route-δ
escape hatch if #85's fix turns out to be a large cross-cell port).
Tasks 12-13 ship the WorldPicker cell-BSP occlusion fix for #86
(no capture dependency — pinned by code-reading). Task 14 closes
out ISSUES.md + roadmap + ships the post-phase handoff doc.

Spec: docs/superpowers/specs/2026-05-19-indoor-walking-phase1-bsp-cluster-design.md

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 14:15:50 +02:00
..
plans docs(plan): Indoor walking Phase 1 — BSP cluster implementation plan 2026-05-19 14:15:50 +02:00
specs docs(spec): Indoor walking Phase 1 — BSP cluster design 2026-05-19 14:07:01 +02:00