After the 2026-05-21 session merged A1/A1.5/A1.6/A1.7 to main, six discrete items remain. This doc maps them as a landscape rather than single-phase: - Collision (M2 critical path): A4 multi-cell BSP iteration → verify stairs → A2 PHSP inversion → A3 synthesis removal - Rendering (M7 polish): indoor lighting + spotlight-projection bugs The recommended order is A4 first (biggest user payoff, unblocks A3), then stairs verification, A2 + A3 paired, lighting in a separate session. A3 must NOT ship before A4 — that's the Bug A regression from 2026-05-20. Includes a pasteable session-start prompt that the user can box into a fresh Claude Code session. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| architecture | ||
| audit | ||
| plans | ||
| research | ||
| superpowers | ||
| bugs.md | ||
| ISSUES.md | ||