acdream/docs
Erik a90f34368f test(p0): dat-backed conformance loader + characterized cottage-doorway topology
P0 (verbatim-spatial-pipeline-port) Tasks 1+2. ConformanceDats loads the
cottage-doorway cells from the real dats with their real ContainmentBsp;
CottageDoorwayCharacterizationTests maps the Holtburg 0140..017F indoor
neighborhood and pins the master-plan threshold building (origin
161.93,7.50,94.00): 0xA9B40170 vestibule (exit portal 0xFFFF + portal to
0171), 0xA9B40171 room. Grid math confirms the outdoor side is landcell
0xA9B40031 -> the 0031<->0170<->0171 ping-pong is verified real. Verified
interior points recorded for the point_in_cell/find_cell_list goldens.

Plan: docs/superpowers/plans/2026-06-03-p0-conformance-apparatus.md
Notes: docs/research/2026-06-03-p0-conformance-apparatus-notes.md

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-03 14:20:17 +02:00
..
architecture docs: render-pipeline SSOT section + #78 reset pointer (redo of edits that silently failed) 2026-05-31 21:50:07 +02:00
audit docs: update audit — Sprint 1 items verified (sequence counters + scenery LCG) 2026-04-13 13:51:39 +02:00
plans docs(render): Phase W — W2a shipped+verified + baseline handoff 2026-06-02 10:55:21 +02:00
research test(p0): dat-backed conformance loader + characterized cottage-doorway topology 2026-06-03 14:20:17 +02:00
superpowers test(p0): dat-backed conformance loader + characterized cottage-doorway topology 2026-06-03 14:20:17 +02:00
bugs.md docs: update bugs.md — close BUG-002/003/004, add BUG-005/006/007 2026-04-14 12:17:31 +02:00
ISSUES.md docs: wrap session — doorway flap FIXED (membership + blue-hole); A/B/C render residuals next 2026-06-03 11:09:57 +02:00