A6.P1 (cdb probe spike) + A6.P2 (analysis report) both SHIPPED this
session. Updated:
docs/plans/2026-04-11-roadmap.md — M1.5 phase block now shows A6.P1
+ A6.P2 SHIPPED with commit refs; A6.P3 entry expanded with the
Finding-2-first sequencing recommendation from A6.P2; A6.P4 entry
notes the original "Holtburg Sewer end-to-end" acceptance walk is
unreachable (sewer doesn't exist).
docs/plans/2026-05-12-milestones.md — M1.5 demo scenario split into
building/cellar half (achievable post-A6.P3) + dungeon half (blocked
on issue #95 visibility blowup; promote to post-M1.5 if #95 isn't
fixed in scope). Issue list updated: added #95 + indoor sling-out
(new from scen4); marked stairs/2nd-floor/cellar as characterized by
A6.P2 Finding 2 family.
CLAUDE.md — Currently-working-toward block now points at A6.P3 as
the active phase. A6.P1 + A6.P2 ship noted with the findings doc
pointer. Demo-scenario note updated to reflect the sewer + #95
reality. Issues-in-scope updated.
Also includes a 1-line trailing-prompt addition to scen3 + scen4
retail.log files (cdb wrote one more `0:000>` after the kill that
landed after the original capture commits).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>