docs/research/2026-06-11-t6-br7-shipped-t5-gate-post-t5-handoff.md:
the 9-commit ledger with decomp anchors, the per-cell shadow
architecture summary, the T5 gate verdict (collision half 100% passed;
#117-#120 filed), the #117 fix detail (depth-gated punch - re-gate
pending), the #118 narrowing + exit-walk harness design, the #119
up-null lead, the #120 armed tripwire, watchouts/DO-NOT-RETRY
additions, new apparatus inventory, the next-session work order, and
the paste-ready prompt.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>