P0 (verbatim-spatial-pipeline-port) Tasks 1+2. ConformanceDats loads the cottage-doorway cells from the real dats with their real ContainmentBsp; CottageDoorwayCharacterizationTests maps the Holtburg 0140..017F indoor neighborhood and pins the master-plan threshold building (origin 161.93,7.50,94.00): 0xA9B40170 vestibule (exit portal 0xFFFF + portal to 0171), 0xA9B40171 room. Grid math confirms the outdoor side is landcell 0xA9B40031 -> the 0031<->0170<->0171 ping-pong is verified real. Verified interior points recorded for the point_in_cell/find_cell_list goldens. Plan: docs/superpowers/plans/2026-06-03-p0-conformance-apparatus.md Notes: docs/research/2026-06-03-p0-conformance-apparatus-notes.md Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| AcDream.App.Tests | ||
| AcDream.Core.Net.Tests | ||
| AcDream.Core.Tests | ||
| AcDream.Core.Tests.Fixtures.HelloPlugin | ||
| AcDream.UI.Abstractions.Tests | ||