acdream/docs
Erik 9efcd80e34 docs: Campaign CC gate round 1 closeout — register/ISSUES/ledger bookkeeping (F3, F12, F15)
Doc-only findings from the round review, plus the register rows the
three code commits' own bookkeeping notes reference:

- F3: AP-229 amended with the dialog-as-sibling z-order addendum — the
  same flat-sibling-list mechanism that motivates AP-229's own screen-
  layering row also covers RetailDialogFactory's open dialogs, which was
  GF-15's actual root cause (now fixed, but the underlying divergence —
  dialogs and screens sharing one z-order list at all — remains and
  could reintroduce the same failure class via a future sibling's own
  unconditional per-tick BringToFront).
- F5/F6: AP-230 amended with the second narrow-honor addendum (the
  LayoutImporter carve-out fix landed in the Group 3 code commit); the
  findings doc's "CHAT INPUT" label corrected to "chat transcript" in
  both places it appeared (0x2100006F/0x10000011 is the transcript
  display, not the input textbox).
- F12: the AD section header recounted 77 -> 79 (a direct physical count
  found it undercounted by 2); the AP section header's own "one high"
  drift-direction note corrected to "one low" — verified against the
  actual commit history (Batch A ended with 165 physical rows but a 164
  header; Batch B's recount correctly landed on 164, the header was
  never overcounting).
- F15: ISSUES.md #406 gains the crash-vs-incomplete-shutdown precedence
  sentence — ReportExited's _runFailure check runs first and returns
  immediately, so a crash always wins over a subsequently-failed
  shutdown for the same session's reported reason.
- AP-231 filed (the Group 2 commit's own ComposeFormula connector-text
  approximation — referenced in that commit's message but the register
  row itself was missed until this pass; 161 active AP rows).
- Campaign CC plan ledger gains a "Gate round 1" row with the full
  commit list for batches A-G plus this session's three closeout
  commits, superseding the ledger's stale "sole remaining acceptance
  step" framing (written before the connected gate ran and found the
  GF-1..GF-16 / R2-1..R2-8 findings this whole round fixed).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-16 15:37:46 +02:00
..
architecture docs: Campaign CC gate round 1 closeout — register/ISSUES/ledger bookkeeping (F3, F12, F15) 2026-08-16 15:37:46 +02:00
audit docs: update audit — Sprint 1 items verified (sequence counters + scenery LCG) 2026-04-13 13:51:39 +02:00
plans docs: Campaign CC gate round 1 closeout — register/ISSUES/ledger bookkeeping (F3, F12, F15) 2026-08-16 15:37:46 +02:00
reference docs(reference): preserve local ACE command catalog 2026-07-27 00:03:58 +02:00
reports docs: the overnight consolidation report, open questions first 2026-07-29 03:54:43 +02:00
research docs: Campaign CC gate round 1 closeout — register/ISSUES/ledger bookkeeping (F3, F12, F15) 2026-08-16 15:37:46 +02:00
superpowers feat(launcher): complete Campaign LA11 pre-gate support 2026-08-15 00:02:04 +02:00
bugs.md docs: reconcile project status and navigation 2026-07-20 13:00:41 +02:00
ISSUES.md docs: Campaign CC gate round 1 closeout — register/ISSUES/ledger bookkeeping (F3, F12, F15) 2026-08-16 15:37:46 +02:00
README.md docs: reconcile project state and refresh README 2026-07-27 12:53:31 +02:00

acdream documentation map

This page is the entry point for project documentation. It distinguishes current sources of truth from implementation history so an old plan or issue banner cannot silently override the current program state.

Current snapshot — 2026-07-27

  • Milestone state: M3, “Cast a spell,” landed 2026-07-21. M4, “Live in the world,” is active.
  • M4 gameplay program: resume the pre-M4 world-interaction completion program. Favorite-spell overflow, status Use/Assess, and the complete assessment surface are user-accepted. Equipped-child picking and vendor browse/transactions remain Slices 46.
  • Structural/runtime state: all eight GameWindow decomposition slices, Modern Runtime Slices AJ, and the connected visual/lifecycle gates are complete. GameWindow is a 1,622-line composition/callback shell. AcDream.Runtime.GameRuntime owns canonical session, entity/object, gameplay, movement, physics, projectile, environment, and portal state; graphical and no-window hosts borrow the same owner graph.
  • Headless state: Slice K is complete. AcDream.Headless is a presentation-free Windows/Linux host with deterministic commands/events, shared immutable content, multi-session isolation, reconnect, resource telemetry, and 1/5/10/30-session gates. The final two-account native-Linux soak completed ten minutes, logged out through ACE, and converged every ownership ledger.
  • Linux graphical state: Slice L0 and the L1 implementation checkpoint are complete at 66f114b2 and 11501d52. Native Windows passes the active modern-GL/audio/window smoke. WSLg X11/Wayland correctly reject their missing GL_ARB_bindless_texture. Physical-Linux validation and L2L6 are explicitly deferred; resume at the supported AMD/NVIDIA L1 gate.
  • Completed gameplay gates: R6 locomotion/collision/projectile/teleport/ radar, two-client portal-out/materialization, indoor prepared collision, loot ordering, local/remote ground drops, and selection-marker lifetime.
  • Separate visual verification: issue #225, the shared-alpha lifestone/particle result; its connected resource-lifetime and performance routes pass.
  • Carried behaviour debt: issue #153 (far teleport onto an unstreamed edge), #116 (narrowed slide response), #235 (capped/RDP jump cadence), and the active temporary-stopgap rows in the divergence register.
  • Divergence audit: 189 active rows — IA 18, AD 38, AP 91, TS 38, and UN 4 — plus retained struck/retired historical rows such as TS-37.
  • Latest automated baseline: the Release build succeeds with the 17 test-project warnings tracked by issue #228; 8,826 tests pass and five are intentionally skipped. App passes 3,763 / 3 skips. The L1 Windows supported smoke and WSLg X11/Wayland negative-capability reports all end with zero window/GL/input/audio ownership.

Sources of truth

Read these in this order when deciding what to do next:

  1. plans/2026-05-12-milestones.md — the active playable outcome, freeze boundaries, and visual gates.
  2. plans/2026-04-11-roadmap.md — strategic phase ledger: shipped, active, deferred, and future work.
  3. ISSUES.md — tactical defects and small follow-ups. The status inside an issue is authoritative; physical order is not.
  4. architecture/retail-divergence-register.md — every known place runtime behavior can differ from retail.
  5. architecture/acdream-architecture.md and architecture/code-structure.md — ownership, dependency, update-thread, and extraction rules.
  6. architecture/worldbuilder-inventory.md — rendering/DAT code already owned in-tree versus mechanisms still ours to port.

If these disagree, milestones control the current outcome, the roadmap controls work ordering, the issue status controls the individual defect, and the architecture documents control implementation shape. Reconcile the stale document in the same change; do not leave both claims standing.

Research and implementation records

  • research/named-retail/ is the primary retail oracle: named pseudo-C, headers, symbols, and types from the Sept 2013 build.
  • research/decompiled/ is the older Ghidra fallback.
  • research/ contains focused pseudocode, traces, fixtures, and gate reports. A dated research note records evidence; it does not become a new roadmap.
  • superpowers/specs/ and superpowers/plans/ are per-slice design and execution records. Completed plans remain historical.
  • audit/ contains completion and conformance audits.
  • reference/ace-commands.md preserves the local ACE server's complete in-game command catalog and points to the authoritative per-command help surface.

Durable memory

  • ../claude-memory/MEMORY.md indexes the live subsystem memories and the render/physics digests. Read a domain digest before changing that subsystem, especially its DO-NOT-RETRY table.
  • ../memory/ contains stable engineering references such as the modern rendering pipeline, two-tier streaming, and toolchain notes.

Memory accelerates recall; it does not outrank the canonical documents above. When current truth changes, update the relevant canonical document and distill only the durable lesson into memory.

Historical and deprecated documents

  • bugs.md is the April 2026 bug snapshot. It is preserved for archaeology and is not an active ledger.
  • Dated plans and specs describe the decision at that time. Their completion wording is historical unless the current milestone/roadmap explicitly links the item as active.
  • Old R1→R8 architecture sequencing is superseded. Current execution comes from the milestones and strategic roadmap.

Documentation maintenance rules

  • Update milestone, roadmap, issue, divergence, architecture, and memory claims in the same commit when a shipped change affects them.
  • Keep one issue ID per defect. Narrow an issue in place; do not reuse another issue's number as a shorthand.
  • Mark automated, connected, and visual gates separately. An automated pass is not a visual acceptance, and an RDP throughput sample is not a local-display visual comparison.
  • Preserve research history, but remove stale “current/next” claims from living documents once the state advances.