- Roadmap shipped-table: two new rows for Phase 1 (diagnostics) + Phase 2 (fix). Header status block updated to 2026-05-19 with the Phase 2 cause + fix one-liner and pointer to the 9 surfaced issues. - ISSUES.md: filed nine new issues (#78-#86) covering the indoor bugs the user observed once the floor rendered. Grouped under an "Indoor walking issue cluster" header. Cross-references the Phase 1 + Phase 2 work that surfaced them. Hypotheses + suspected root causes documented for each. The 9 issues split into two probable shared-cause groups: - Cell BSP / portal cull (#78, #84, #85, #86) — likely fixable in one phase. - Indoor lighting plumbing (#79, #80, #81, #82) — needs separate investigation per-symptom. Plus #83 (stairs) which probably needs its own physics phase work. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| architecture | ||
| audit | ||
| plans | ||
| research | ||
| superpowers | ||
| bugs.md | ||
| ISSUES.md | ||