acdream/docs
Erik d063ac884d docs(plan): Phase L.3.1+L.3.2 PositionManager + retail-faithful jump plan
6-task plan with subagent dispatch on Tasks 1, 3, 5:
- Task 1: PositionManager class + 6 unit tests (subagent)
- Task 2: Plumb IsGrounded through EntityPositionUpdate (parent, ~5 lines)
- Task 3: Retail-faithful per-frame remote tick (subagent — biggest:
  RemoteMotion.Position field + OnLivePositionUpdated rewrite [airborne
  no-op + landing transition + grounded routing] + TickAnimations rewrite
  [PositionManager.ComputeOffset + UpdatePhysicsInternal])
- Task 4: USER GATE (visual verification with retail observer)
- Task 5: Cleanup commit (subagent, parallel with 6)
- Task 6: Roadmap + spec status update (parent, parallel with 5)

Each task has TDD-style steps with exact file paths, code blocks, and
commit messages. Spec at c4446e7 lists L.3.1's already-shipped 6 commits;
this plan picks up from the revert at 1641d6e.

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-05-03 10:10:16 +02:00
..
architecture docs(physics): Phase L.2 movement collision conformance plan 2026-04-29 21:28:56 +02:00
audit docs: update audit — Sprint 1 items verified (sequence counters + scenery LCG) 2026-04-13 13:51:39 +02:00
plans docs(roadmap): Phase M — Network Stack Conformance plan 2026-05-02 16:14:05 +02:00
research docs(spec): Phase L.3 — Remote Entity Motion Conformance design 2026-05-02 18:12:18 +02:00
superpowers docs(plan): Phase L.3.1+L.3.2 PositionManager + retail-faithful jump plan 2026-05-03 10:10:16 +02:00
bugs.md docs: update bugs.md — close BUG-002/003/004, add BUG-005/006/007 2026-04-14 12:17:31 +02:00
ISSUES.md fix(motion): jump direction, AutoPos cadence, backward/strafe wire & anim 2026-05-02 16:11:15 +02:00