acdream/docs/superpowers
Erik fabb966c57 docs(plans) Campaign FW: implementation plan, roadmap entry, spec approval
Stages FW0-FW6: walk oracle fixtures -> pure-CPU RetailFrameWalk/PViewSet
-> order-preserving submitter -> static cutover with the perf stop-rule
-> entity/particle/dynamics cutover deleting the patch apparatus ->
retail camera envelope -> closeout. The plan carries the recon-verified
seam map (frame chain, replace-vs-reuse split in the dispatcher, the
complete visibility-consumer list, the streaming atomicity facts, exact
patch-apparatus sites) and the binding rules (fail loud, transition
checklist, no dual path). Campaign renamed W->FW: the roadmap already
owns Phase W (UCG).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-08-30 08:38:47 +02:00
..
plans fix(world): remove non-retail portal exit fade 2026-07-15 23:20:52 +02:00
specs docs(plans) Campaign FW: implementation plan, roadmap entry, spec approval 2026-08-30 08:38:47 +02:00