Task 22+23: WbDrawDispatcher + surface metadata side-table (01cff41) Task 24: sky pass structurally independent (5df9135) Task 25: all spec-required micro-tests covered (940/948 pass, 8 pre-existing) Remaining: Task 26 (visual verification, human-in-the-loop), Task 27 (legacy deletion), Task 28 (finalize). Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
01cff41
5df9135