acdream/docs/plans
Erik 0a20090eba docs(roadmap): mark Phase A.3 (background net receive thread) as shipped
All Foundation sub-pieces now shipped:
  A.1 ✓ Streaming landblock loader
  A.2 ✓ Frustum culling (~160fps)
  A.3 ✓ Background net receive thread
  A.4   Folded into A.1 (deferred — DatCollection not thread-safe)

Phase A (Foundation) is complete. Next: Phase B (Gameplay).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-12 09:24:59 +02:00
..
2026-04-10-phase-1-terrain-and-plugin-scaffold.md docs: phase 1 implementation plan 2026-04-10 09:17:49 +02:00
2026-04-10-phase-2-static-meshes-design.md docs(phase-2): refine design after DatReaderWriter spike 2026-04-10 17:18:43 +02:00
2026-04-10-phase-2-static-meshes-plan.md docs: phase 2 implementation plan (tasks 1-10 full, 11-18 sketch) 2026-04-10 17:27:53 +02:00
2026-04-10-phase-2b-design.md docs: phase 2b design — atlas textures, neighbors, dual cameras, plugin api 2026-04-10 20:00:23 +02:00
2026-04-10-phase-2b-plan.md docs: phase 2b implementation plan (9 tasks) 2026-04-10 20:13:03 +02:00
2026-04-10-phase-3c-terrain-blending-plan.md docs(plan): Phase 3c terrain blending plan 2026-04-10 23:43:04 +02:00
2026-04-10-phase-4-networking-design.md docs(plan): Phase 4 networking design 2026-04-10 22:31:26 +02:00
2026-04-10-plugin-architecture-design.md docs: plugin architecture design 2026-04-10 09:11:52 +02:00
2026-04-11-roadmap.md docs(roadmap): mark Phase A.3 (background net receive thread) as shipped 2026-04-12 09:24:59 +02:00