14-task plan covering the diagnostic-driven phase: probe + capture + three fix commits + docs. Tasks 1-6 land the [indoor-bsp] probe in one feature commit. Task 7 is the user-run capture gate. Tasks 8-11 do post-capture diagnosis + fix for #84 and #85 (with a route-δ escape hatch if #85's fix turns out to be a large cross-cell port). Tasks 12-13 ship the WorldPicker cell-BSP occlusion fix for #86 (no capture dependency — pinned by code-reading). Task 14 closes out ISSUES.md + roadmap + ships the post-phase handoff doc. Spec: docs/superpowers/specs/2026-05-19-indoor-walking-phase1-bsp-cluster-design.md Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com> |
||
|---|---|---|
| .. | ||
| plans | ||
| specs | ||