Erik 297d1c54e8 capture(research): A6.P1 scen2 — replace acdream pair with stair-attempt
Original acdream capture (a9a427f) was a doorway-walk because acdream's
indoor stair physics doesn't work. For A6.P2 to characterize the
divergence we need the FAILURE captured, not a substitute walk.

User re-attempted the inn stairs in acdream (whatever it produces:
bumping, sliding, stuck). Failure signature is dramatic vs door-walk:

  Tag             | door-walk | stair-attempt | ratio
  ----------------+-----------+---------------+------
  push-back-disp  | 1,141     | 4,156         | 3.6x
  push-back-cell  | 87        | 1,478         | 17x
  other-cells     | 87        | 1,478         | 17x
  indoor-bsp      | 343       | 1,286         | 3.7x
  indoor-walkable | 227       | 859           | 3.8x
  cp-write        | 70,244    | 33,969        | 0.5x (!)

The 17x explosion on push-back-cell / other-cells says acdream's
CheckOtherCells loop fires constantly when physics can't resolve a
stair-step — the indoor BSP query fails, then the multi-cell
fallback fails, then the next tick repeats. The cp-write DROP
(half the door-walk volume) is the inverse signal: when no ground
plane resolves, no CP gets written. Both are A6.P2 fix-surface
indicators.

Now scen2 pair = retail successfully climbs (BP2 step_up=188) vs
acdream tries and fails (push-back-cell explosion).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-21 20:26:20 +02:00
..
architecture ship(O): Phase O — DatPath Unification — SHIPPED 2026-05-21 17:41:15 +02:00
audit docs: update audit — Sprint 1 items verified (sequence counters + scenery LCG) 2026-04-13 13:51:39 +02:00
plans ship(O): Phase O — DatPath Unification — SHIPPED 2026-05-21 17:41:15 +02:00
research capture(research): A6.P1 scen2 — replace acdream pair with stair-attempt 2026-05-21 20:26:20 +02:00
superpowers docs(plan): Phase A6.P1 — cdb probe spike implementation plan 2026-05-21 18:07:37 +02:00
bugs.md docs: update bugs.md — close BUG-002/003/004, add BUG-005/006/007 2026-04-14 12:17:31 +02:00
ISSUES.md docs(milestones): promote indoor work to M1.5 — primary focus 2026-05-21 10:32:24 +02:00