docs: Campaign CC connected gate PASSED — campaign CLOSED user-accepted 2026-08-16

The extended gate round (GF-1..16, R2/R3/R4 re-tests, fix batches A-G +
closeout + two re-test rounds) closed with the user's pass on build
1.0.2-cc.o. Plan status and ledger flipped; findings doc carries the
full round history.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
Erik 2026-08-16 19:13:36 +02:00
parent e6acb800cc
commit ff8b1ebc89
2 changed files with 20 additions and 3 deletions

File diff suppressed because one or more lines are too long