docs(N.4): mark Tasks 22-25 complete in progress table
Task 22+23: WbDrawDispatcher + surface metadata side-table (01cff41) Task 24: sky pass structurally independent (5df9135) Task 25: all spec-required micro-tests covered (940/948 pass, 8 pre-existing) Remaining: Task 26 (visual verification, human-in-the-loop), Task 27 (legacy deletion), Task 28 (finalize). Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
parent
5df9135e0e
commit
fc80c252d6
1 changed files with 3 additions and 4 deletions
|
|
@ -92,10 +92,9 @@ Status: **Living document — work in progress, started 2026-05-08.**
|
|||
| 17 — EntitySpawnAdapter | ✅ + Adj. 4 | `c02c307` |
|
||||
| 20 — Per-instance decode conformance | ✅ structural (Adj. 5) | (no test file) |
|
||||
| 21 — Week 3 wrap-up | ✅ | (this commit) |
|
||||
| 22 — WbDrawDispatcher full draw loop | pending | — |
|
||||
| 23 — Surface metadata side-table population | pending | — |
|
||||
| 24 — Sky-pass preservation check | pending | — |
|
||||
| 25 — Component micro-tests round-out | pending | — |
|
||||
| 22+23 — WbDrawDispatcher + side-table population | ✅ | `01cff41` |
|
||||
| 24 — Sky-pass preservation check | ✅ structural (independent) | `5df9135` |
|
||||
| 25 — Component micro-tests round-out | ✅ all spec tests covered | — |
|
||||
| 26 — Visual verification + flag default-on | pending | — |
|
||||
| 27 — Delete legacy code paths | pending | — |
|
||||
| 28 — Update memory + ISSUES + finalize plan | pending | — |
|
||||
|
|
|
|||