docs(runtime): close J1 contract gate

Record the exact-binary connected lifecycle/reconnect acceptance, synchronized active pointers, rollback, and durable evidence before session ownership moves in J2.
This commit is contained in:
Erik 2026-07-25 19:16:30 +02:00
parent 854d9e9cd1
commit f84624b1e9
9 changed files with 146 additions and 16 deletions

View file

@ -1673,14 +1673,19 @@ port in any phase — no separate listing here.
> skips plus both exact-binary connected routes; every stable checkpoint
> reports `0/0/0` graph residency while flat assets remain populated. J0
> established the presentation-independent Runtime boundary with four enforced
> dependency guards; J1 is now active.
> dependency guards. J1 now provides borrowed views, typed press-time commands,
> ordered deltas, an instance clock, generation/lifecycle state, and teardown
> acknowledgements over the same canonical owners. Its 13 Runtime tests, 3,838
> App tests / 3 skips, 8,424-test / 5-skip complete Release suite, and exact-
> binary seven-checkpoint lifecycle/reconnect gate pass with graceful exits.
> J2 is now active.
> The historical exact cutover
> rollback remains
> `git revert ef1d263337997bb030eadb7b8e71d73dc659907a`. Slice H is complete:
> retained UI/frame work, exact bounded light selection, and
> pooled/borrowed/direct network I/O pass 8,292 Release tests / 5 skips and the
> connected lifecycle/reconnect gate. Slice I is closed in
> [its detailed plan](2026-07-25-modern-runtime-slice-i.md); Slice J1 executes
> [its detailed plan](2026-07-25-modern-runtime-slice-i.md); Slice J2 executes
> from [its lifetime-group plan](2026-07-25-modern-runtime-slice-j.md).
**Spec:** `docs/superpowers/specs/2026-07-05-modern-pipeline-design.md` (the