docs: reconcile project state and refresh README
Some checks failed
Headless portability / portable-headless (ubuntu-latest) (push) Has been cancelled
Headless portability / portable-headless (windows-latest) (push) Has been cancelled
Headless portability / linux-graphical (push) Has been cancelled

This commit is contained in:
Erik 2026-07-27 12:53:31 +02:00
parent 97a095d628
commit f6275f4501
12 changed files with 432 additions and 295 deletions

View file

@ -116,24 +116,24 @@ user-gated. Deterministic world-lifecycle automation protects fresh login,
outdoor/world-edge/dungeon travel, same-location revisit, exact graceful
disconnect, and uncapped fresh-process reconnect with JSON/PNG artifacts.
Release builds; the current performance-program checkpoint passes
3,731 App tests / 3 skips and 8,708 complete-solution tests / 5 skips.
3,763 App tests / 3 skips and 8,826 complete-solution tests / 5 skips.
**M4 feature work order (paused while the authorized performance program
executes):** the six-slice pre-M4 world-interaction completion
**M4 feature work order (active after the Modern Runtime closeout and Slice L
deferral):** the six-slice pre-M4 world-interaction completion
program in `docs/plans/2026-07-23-world-interaction-completion.md`: favorite
spell-bar overflow, status Use/Assess, assessment information,
equipped-child picking, vendor browsing, and authoritative vendor
transactions. Slices 1 and 2 plus the adjacent shared-cooldown presentation are
user-accepted. Slice 3's first connected gate exposed and corrected the
monster-response flag mismatch, non-retail shared-panel mounting, and missing
inscription transaction. The creature and common-item report corrections are
user-accepted. Favorite-spell press-time selection and right-click local
examination are implemented; the current visual gate is its corrected modern
scarab/prismatic formula, DAT component icons, and authored 310 x 400 extent.
transactions. Slices 13 plus the adjacent shared-cooldown presentation are
user-accepted, including exact response flags, independent examination
window, inscription transaction, complete creature/item/spell reports,
favorite-spell press/right-click behavior, modern scarab/prismatic formula,
DAT component icons, foreground stacking, and authored 310 x 400 extent.
Resume at Slice 4 equipped-child world picking, then vendor browse and
authoritative transactions.
**Current active engineering work:** complete Slices DL of
`docs/plans/2026-07-24-modern-runtime-architecture.md` under the recorded
approval interlocks. Slices AH completed by 2026-07-25.
**Modern Runtime/performance status:** Slices AK of
`docs/plans/2026-07-24-modern-runtime-architecture.md` are complete. Slice L is
parked at its L1 implementation checkpoint by user direction on 2026-07-27.
Production world-mesh streaming now consumes the validated machine-local
`acdream.pak` through `IPreparedAssetSource`; live DAT extraction remains
explicit bake/equivalence/UI-Studio tooling. Capped, uncapped, dense-Arwic,