docs(runtime): close cost-budgeted streaming slice

Record the exact physical-display evidence, ownership fixes, budget semantics, and performance deltas that close Slice E. Reconcile the architecture, roadmap, milestones, issues, documentation map, and session instructions before the explicit F/G approval gate.

Co-authored-by: Erik Nilsson <erikn@users.noreply.github.com>
This commit is contained in:
Erik 2026-07-24 20:52:20 +02:00
parent 91e82c3c68
commit e7d9d6fa7d
12 changed files with 290 additions and 46 deletions

View file

@ -14,7 +14,7 @@ banner cannot silently override the current program state.
[`plans/2026-07-23-world-interaction-completion.md`](plans/2026-07-23-world-interaction-completion.md).
The eight-slice `GameWindow` decomposition and its connected visual matrix
are complete.
- **Current active engineering program:** Slices AD and Slice E0E5 of
- **Current active engineering program:** Slices AE of
[`plans/2026-07-24-modern-runtime-architecture.md`](plans/2026-07-24-modern-runtime-architecture.md)
are complete. Production world-mesh streaming consumes the validated
prepared package, typed residency is bounded/accounted, and streaming now
@ -23,9 +23,10 @@ banner cannot silently override the current program state.
statics, building registries, collision/reflood, and EnvCells. The canonical
reveal generation now owns an exact destination reservation across every
typed budget dimension; incomplete destinations remain in portal space and
receive retail's centered wait cue instead of forced early reveal. The
physical console is available for E6 deterministic/connected closeout. See
the [Slice D residency report](research/2026-07-24-slice-d-unified-residency-report.md).
receive retail's centered wait cue instead of forced early reveal. E6's
deterministic/resource gates and capped, uncapped, and dense-Arwic
physical-local routes pass. Slices F/G await their explicit approval gate.
See the [Slice E streaming report](research/2026-07-24-slice-e-cost-budgeted-streaming-report.md).
- **Completed gates:** R6 locomotion/collision/projectile/teleport/radar and
the final two-client portal-out/materialization observer comparison (`#218`).
- **Separate visual verification:** the shared-alpha lifestone/particle result
@ -36,7 +37,7 @@ banner cannot silently override the current program state.
user decision gate; Linux/headless automation (Track LH) remains future work.
- **Divergence audit:** 178 active rows — IA 17, AD 37, AP 85, TS 34,
and UN 5 — plus the retained retired TS-37 history note.
- **Latest automated baseline:** Release build succeeds; 8,158 tests pass and
- **Latest automated baseline:** Release build succeeds; 8,164 tests pass and
five are intentionally skipped. The capped, uncapped, and dense-Arwic
physical prepared-asset routes all completed their portal/input/lifetime
assertions and disconnected gracefully.