docs(architecture): close GameWindow slice 5
This commit is contained in:
parent
4a205a3e56
commit
d4ecac1da3
7 changed files with 70 additions and 43 deletions
|
|
@ -19,14 +19,15 @@ layer, the active structural prerequisite is the behavior-preserving
|
|||
The 2026-07-21 audit baseline was 15,723 lines, 278 fields, and 205 methods.
|
||||
Selection/interaction Slice 1, live-animation-presentation Slice 2, complete
|
||||
live-session ownership Slice 3, and live-entity App integration Slice 4 are
|
||||
complete. Slice 5 landblock-presentation checkpoints A–G are also complete:
|
||||
complete. Slice 5 landblock presentation is also complete:
|
||||
the worker DAT transaction, render/physics/static publishers, and retryable
|
||||
Near/full retirement now have focused owners. The direct production cutover
|
||||
also serializes complete old-window retirement with teleport and session
|
||||
origin lifetimes. `GameWindow` is 8,793 raw lines, down 1,508 from the Slice-5
|
||||
baseline and 6,930 (44%) from the campaign baseline. The full Release suite
|
||||
passes 7,052 tests / 5 skips; Slice 4's seven-destination connected R6 route
|
||||
passed in 310 seconds. Slice 5H deterministic/connected closeout is active.
|
||||
origin lifetimes. `GameWindow` is 8,811 raw lines / 247 fields / 153 methods,
|
||||
down 1,490 lines from the Slice-5 baseline and 6,912 (44%) from the campaign
|
||||
baseline. The full Release suite passes 7,054 tests / 5 skips; the 311-second
|
||||
capped/reconnect lifecycle gate and synchronized 394-second nine-destination
|
||||
resource soak both pass. Slice 6 update-frame orchestration is next.
|
||||
|
||||
Carried:
|
||||
#153 far-teleport residual, #116 slide-response, the remaining R6 ownership cleanup plus
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue