@ -691,6 +691,18 @@ Update immediately when a slice changes state. Chat is not the ledger.
| S4 Depth + alpha | PLANNED — the Holtburg terrain-punch finding carried from G2 may close in S3 chunk 3 by draw ORDER alone (retail draws every nearer land cell's terrain AFTER a farther building's far-Z punch; acdream draws all terrain first — `s3-walk-ownership-map.md` §9 R4); S4 re-reads its "exact z-func" question only if the Holtburg self-gate still shows the fragments after chunk 3 | depth/alpha contracts + captures | — | — | — | G3 | retires AP-34 |
| S5 Consumers + closeout | PLANNED | landscape contract; AP-232 | — | — | — | G4 | retires AP-117/AP-232; deletes probes |
**2026-09-05 C1a final verification update:** supersedes the S5 row's pending
final C1a test status. Clean eea83ac88: full literal-hermetic Release
0W0E/17,094 passed/0 failed/0 skipped; two fresh actual-product plus full
25-frame-consumer processes2/2 each, equal hashes/counts. Corrected canonical
InstalledDat376 passed/8 existing failed/1 existing skipped; no new
nonpassing identities. Four wall tests pass after correcting an omitted
package-path prerequisite, with the invalid first invocation retained.
All92 official manifest entries verified; see
`docs/research/2026-09-01-overhaul/c1a-integrated-verification.md`.
Final graphical lifecycle/reconnect/R6, remaining matrix and owner G4
remain owed. Known retail leak unchanged, FPS/C2 deferred, no main merge.
### Rollback ledger
| Slice | Commits | Last accepted gate | Revert |