docs(plan): VM7 ledger row — automated rows passed, owner gates and merge owed (Campaign VM)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
parent
94a9f4537a
commit
ba1c50c9c2
2 changed files with 3 additions and 3 deletions
|
|
@ -83,9 +83,9 @@ single-pass path darkens by ~10 %. Neither explains a scene-wide level.
|
|||
| VM4 | F5 — overclaiming docs, incl. the reviewer's own | **CLOSED 2026-08-22** |
|
||||
| VM5 | F8 — volumetric banding; F7 filed | **CLOSED 2026-08-22** (#421) |
|
||||
| VM6 | Foliage wind | **CODE-COMPLETE 2026-08-23** — `0930c35d`, `39e8408c`, `43e3abed`, `a82959f1`, `fccba839`, `eec95535`, `754d59d9`, `1f151242`; five Opus review rounds (round 3 APPROVE; round 4 REJECT caught the overhead-sun regression, fixed in round 5; round 5 APPROVE, its four nits closed in `1f151242`); pixel proof [note](../research/2026-08-23-vm6-foliage-wind-pixel-proof.md) (14,993 robust wind px vs 65 floor, scenery only; wind-off frames match the plain pipeline at mean |Δ| 0.007); **owner visual gate OWED** (§VM6 Acceptance) |
|
||||
| VM7 | Closeout: full gates, register, roadmap, merge | **owner** |
|
||||
| VM7 | Closeout: full gates, register, roadmap, merge | **AUTOMATED ROWS PASSED 2026-08-23** — release gate 15,283/0/0, connected route PASS pack-off + High, VM0 invariance on the final binary (robust 5–10 px), performance matrix PASS, #422 re-characterised (pack-independent, ~2 %, no stack yet); [closeout note](../research/2026-08-23-vm7-automated-closeout.md). **Owner visual gates (VM3, VM6, VM7 matrix) and the merge OWED** |
|
||||
|
||||
Order is VM2 (done) → VM0 (done) → VM1 (done) → VM4 (done) → VM5 (done) → VM3 (code-complete, gate owed) → VM6 (code-complete, gate owed) → VM7. VM0 goes first because everything after it is measured
|
||||
Order is VM2 (done) → VM0 (done) → VM1 (done) → VM4 (done) → VM5 (done) → VM3 (code-complete, gate owed) → VM6 (code-complete, gate owed) → VM7 (automated rows passed; owner gates + merge owed). VM0 goes first because everything after it is measured
|
||||
against the baseline it establishes.
|
||||
|
||||
---
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue