docs(overhaul): record provisional exterior coverage re-gate for #473
This commit is contained in:
parent
bf23673f3d
commit
b8d80e507f
7 changed files with 158 additions and 10 deletions
|
|
@ -696,7 +696,7 @@ Update immediately when a slice changes state. Chat is not the ledger.
|
|||
| S5-#470 | **LANDED + REVIEW-CLOSED 2026-09-05; LEAD GRAPHICAL A/B PROVISIONAL PASS.** Campaign implementation stack `15a796c3a` -> `7506e5f14` -> `b333edb4f`; route `19b44e5e3`; reviewed scratch `51f974da4` -> `2cad9c84` -> `98c004aa7`; packet §§27–30. | G4 UNPASSED | Retail/behavior pass 2/10 and production pass 4/10 closed the two evidence-only findings. Fresh campaign Release 0W/0E and focused 48/48; exact scratch hermetic 16,976/16,976 and canonical InstalledDat 386/10/1, manifests 30/30. Pinned gate `logs/selfgate-20260905-032132-s5-470-pinned-shadow-ab-r1`: retail/off -> High -> retail/off, 3/3 PNGs, exit 0, graceful, no client; visual PASS provisional. The stale recipe-8 pre-route launch is excluded and recorded in §30. |
|
||||
| S5-#469 | **LANDED + REVIEW-CLOSED 2026-09-05; LEAD GRAPHICAL TRANSITION PROVISIONAL PASS.** Contract `809887524`; reviewed scratch `c09b6cf0f`; campaign implementation `94ddde69a`; route `62efc72cb`; packet §§31–32. | G4 UNPASSED | Retail/deviation pass 1/10 and production pass 2/10 both PASS with no finding. The two atmospheric vertex receivers keep retail's authored unnormalized `uLights` direction across every shadow gate; celestial direction remains for opt-in shadow/volumetric projection; IA-24 corrected in the same commit. Exact scratch: Release 0W/0E, focused 126/126, Vulkan 2/2, hermetic 16,983/16,983, InstalledDat 386/10/1. Fresh campaign Release 0W/0E, focused 82/82, Vulkan 2/2. Gate `logs/selfgate-20260905-040449-s5-469-lighting-transition-r1`: five PNGs, active 2,500-caster/four-cascade High rows, no near-black relight, exit 0/graceful, no client; visual PASS provisional. |
|
||||
| S5-c5 | **CLOSED + LANDED 2026-09-05; LEAD GRAPHICAL SMOKE PROVISIONAL PASS.** Contract `b77989c32`; campaign `bf53e2ad6` -> `e625dc4e6` -> `1b7ee4e58`; reviewed scratch tip `158656f0d`; packet §§33–35. | G4 UNPASSED | Retail/deletion pass 1/10 PASS. Production pass 2/10 found one static-field hole in the owner guard; fix round 1 reproduced both static-owner mutations, and production pass 3/10 PASS. Exact scratch hermetic 16,921/16,921, canonical InstalledDat 368/9/1, manifests 30/30. Fresh campaign Release 0W/0E, App 146/146, Core 8/8. A stale recipe-8 preflight is excluded; a non-destructive recipe-10 bake produced 2,237,865 keys with zero failures. Corrected gate `logs/selfgate-20260905-052130-s5-c5-landed-v10`: five PNGs, exit 0/graceful, no fatal/deleted-prefix match, no client left; geometry matches S5-c4, visual PASS provisional. |
|
||||
| S5 | **OWNER VISUAL GATE FAIL — #473 code-repaired and review-closed; exterior re-gate pending (2026-09-05).** c1–c5 plus #470/#469 landed; prior self-PASS is not owner acceptance. C1 offline evidence complete; C1c test correction frozen pending review. | G4 | Packet §§7 and 12–42 bind. §42 repairs detail-active opaque A2C coverage loss at the owner's 4x/A2C=true settings. Both independent review lenses PASS; 45 focused/46 register-inclusive/158 adjacent tests pass; restored old-arm mutation fails12/12. All52 affected base/LOD prepared payloads match fresh extraction. Correctly framed full Holtburg/cathedral exterior PNG re-gate remains; prior images were inadequate. Then C1c review/landing, real geometry/membership hash, full-lane closure, C2 and full owner G4 remain. Never merge main before G4. |
|
||||
| S5 | **#473 REPAIR LANDED/REVIEW-CLOSED `bf23673f3`; sampled exterior self-gate PROVISIONAL PASS, owner re-gate pending (2026-09-05).** c1–c5 plus #470/#469 landed; lead PASS does not supersede owner FAIL. C1 offline evidence complete; C1c test correction frozen pending review. | G4 | Packet §§7 and 12–42 bind. §42 repairs detail-active opaque A2C coverage loss at the owner's 4x/A2C=true settings. Both independent reviews PASS; post-commit Release 0W/0E and 158/158 adjacent tests; old-arm mutation fails12/12. All52 affected base/LOD prepared payloads match fresh extraction. §42.6 exact-binary PNGs show intact visible Holtburg/cathedral exteriors, detail ON in both modes; Facility control passes provisionally. Framing/foliage limitations are explicit; no every-face/LOD claim. All four sequential clients exited0/gracefully; none remains, ACE up. C1c review/landing, real geometry/membership hash, full-lane closure, C2 and full owner G4 remain. Never merge main before G4. |
|
||||
|
||||
---
|
||||
|
||||
|
|
|
|||