docs(physics): hand off initial create residence
This commit is contained in:
parent
38fd4b8dc9
commit
9d601817b8
4 changed files with 334 additions and 19 deletions
|
|
@ -66,17 +66,17 @@ waived the general sweep and explicitly deferred the barred-house gate as
|
|||
authorized retirement of the remaining proven collision/placement gaps before
|
||||
vendor work resumes. Nested retry, edge/StepDown/Path-6 ordering, exact cell
|
||||
availability, atomic collision generations, canonical Core SetPosition,
|
||||
Runtime lost-cell residence, and the dormant placement receipt channel are
|
||||
landed. Placement Slice 4B2 checkpoint 2 adds the presentation-free Runtime
|
||||
owner for retail collision tracking, environment latch, ordered callbacks,
|
||||
missile-state clearing, expiry/force-end lifetime, and SetPosition's exact
|
||||
report-result boolean. It deliberately does not activate an App or Headless
|
||||
production route. Next are exact authored mover preparation, the atomic shared
|
||||
body/controller transaction, presentation-only placement observers, collision-
|
||||
prefix quiescence, and the all-route cutover which can retire AP-1/AD-1. AP-22
|
||||
authored object shapes and AD-10 remote contact-plane projection follow, then
|
||||
the final matrix and ledger closeout. Detailed handoff:
|
||||
[`2026-07-31-runtime-set-position-collision-reporting-handoff.md`](../research/2026-07-31-runtime-set-position-collision-reporting-handoff.md).
|
||||
Runtime lost-cell residence, authored mover/body preparation, placement
|
||||
receipts and observers, collision-prefix replacement, authoritative route
|
||||
classification, and initial Create residence are landed as bisectable
|
||||
checkpoints. Commit `38fd4b8d` retains the accepted Create placement plus
|
||||
fresher Position FIFO until exact placement and ordered adoption complete.
|
||||
Production Create registration is not yet cut over. Next are the synchronous
|
||||
Runtime continuation executor, retail's exact Create tail ordering, and the
|
||||
all-host/all-route cutover which can retire AP-1/AD-1. AP-22 authored object
|
||||
shapes and AD-10 remote contact-plane projection follow, then the final matrix
|
||||
and ledger closeout. Current handoff:
|
||||
[`2026-08-01-runtime-initial-create-residence-handoff.md`](../research/2026-08-01-runtime-initial-create-residence-handoff.md).
|
||||
|
||||
---
|
||||
|
||||
|
|
|
|||
|
|
@ -91,14 +91,15 @@ broaden the feature surface. Slices 1–4 are user-accepted. Campaign P's
|
|||
connected feel matrix closed on 2026-07-31 with tight-gap collision clearance
|
||||
(#273) and the deferred restricted-house gate (#274) explicitly carried. The
|
||||
user subsequently authorized the remaining physics-divergence closeout before
|
||||
vendor work. Placement Slice 4B2 checkpoint 2 now gives Runtime the retail
|
||||
SetPosition collision table, environment latch, ordered report callbacks, and
|
||||
exact report-result owner without activating production placement. The
|
||||
remaining order is authored mover/body preparation, atomic graphical/no-window
|
||||
body publication, presentation-only projection and prefix quiescence, then the
|
||||
all-route SetPosition cutover; AP-22 shape fidelity and AD-10 remote contact-
|
||||
plane projection follow. Resume Slice 5 vendor browsing only after that
|
||||
closeout or a new explicit user direction.
|
||||
vendor work. Placement Slice 4B2 is now complete through dormant SetPosition
|
||||
activation, graphical/no-window placement receipts, collision-prefix
|
||||
replacement, authoritative route classification, pre-placement App staging,
|
||||
and Runtime's initial Create residence/FIFO transaction at `38fd4b8d`.
|
||||
Production Create registration is not yet cut over. The remaining order is one
|
||||
synchronous continuation executor with retail's exact Create tail, the all-
|
||||
host/all-route cutover, AP-22 shape fidelity, AD-10 remote contact-plane
|
||||
projection, and the final matrix/ledger closeout. Resume Slice 5 vendor
|
||||
browsing only after that closeout or a new explicit user direction.
|
||||
|
||||
The separately authorized modern-runtime performance program has completed
|
||||
Slices A–D: corrected measurement, prepared-package bake/dedup, package-only
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue