docs(runtime): close Slice J and activate Slice K
Record the shared graphical/no-window reset architecture, deterministic lifecycle evidence, exact rollback point, and synchronized project guidance before beginning the Linux headless host. Co-authored-by: Codex <noreply@openai.com>
This commit is contained in:
parent
a9a822f206
commit
953c469cac
12 changed files with 210 additions and 35 deletions
|
|
@ -25,8 +25,9 @@ J6 completed at `18d17d8b`: Runtime owns world environment, canonical reveal
|
|||
generation/readiness, exact F751/Position destination correlation, and the
|
||||
generation/cell-scoped graphical-host acknowledgement suffix. J7 completed
|
||||
at `ce41efb9` with its automated gates and the user's 2026-07-27
|
||||
physical-display acceptance. J8 no-window integration and Slice-J closeout are
|
||||
active.
|
||||
physical-display acceptance. J8 and Slice J closed at `a9a822f2`: graphical
|
||||
and direct hosts share one `GameRuntime`, one retryable generation-reset
|
||||
transaction, and one canonical gameplay-owner graph. Slice K is active.
|
||||
|
||||
**Scope:** Reconcile and sequence the existing Modern Pipeline (`MP`) and
|
||||
Linux/headless (`LH`) tracks using the 2026-07-24 connected performance audit.
|
||||
|
|
@ -1065,7 +1066,7 @@ host-parity tests after each move.
|
|||
|
||||
**Prepared execution plan:**
|
||||
[`2026-07-26-modern-runtime-slice-k.md`](2026-07-26-modern-runtime-slice-k.md).
|
||||
Implementation begins after Slice J's no-window closeout.
|
||||
Implementation began after Slice J's no-window closeout at `a9a822f2`.
|
||||
|
||||
**Purpose:** Deliver efficient automated bots.
|
||||
|
||||
|
|
@ -1304,8 +1305,10 @@ projection stages and App owns only retryable resource receipts. Its 365
|
|||
Runtime tests, 3,716 App tests / 3 skips, 8,642-test / 5-skip complete Release
|
||||
suite, and exact-binary lifecycle/reconnect gate pass with zero ownership debt
|
||||
at every stable checkpoint. J7 completed at `ce41efb9`, and the user accepted
|
||||
its exact post-cutover visual matrix on 2026-07-27. J8 is the current execution
|
||||
point.
|
||||
its exact post-cutover visual matrix on 2026-07-27. J8 closed Slice J at
|
||||
`a9a822f2`; 395 Runtime tests, 3,731 App tests / 3 skips, 8,696 complete-
|
||||
solution tests / 5 skips, lifecycle/reconnect, and canonical nine-stop gates
|
||||
pass. Slice K is the current execution point.
|
||||
Evidence:
|
||||
[`../research/2026-07-25-slice-g5-production-profile.md`](../research/2026-07-25-slice-g5-production-profile.md)
|
||||
and
|
||||
|
|
|
|||
Loading…