docs: Campaign N CLOSED - user-accepted; #260 closed; #262 filed

The acceptance session on Coldeve ran 20 portal transits with zero wedges and captured a real wire-loss recovery live (resend/s=1 nak-in=1 mid-session, converged net-final ledger, graceful logout) - the event class that permanently killed sessions before N1. #260 is closed on that evidence. The one unrelated observation (first-login run-on-the-spot until a recall reset, self-healed, not reproduced on relogin) is filed as #262 with hypotheses and the no-workaround rule restated. Campaign doc, roadmap, and CLAUDE.md pointers flipped to the closed record.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
Erik 2026-07-29 17:48:45 +02:00
parent 5872826a13
commit 91d1d0d6f4
3 changed files with 54 additions and 11 deletions

View file

@ -572,7 +572,7 @@ render/streaming work at `claude-memory/project_render_pipeline_digest.md`.
Documentation entry point: [`docs/README.md`](docs/README.md).
For canonical state, read in this order:
- [`docs/plans/2026-07-29-network-transport-campaign.md`](docs/plans/2026-07-29-network-transport-campaign.md) — **ACTIVE: Campaign N, the retail reliable-transport port.** The #260 root cause (no packet-loss recovery in either direction), the retail mechanism map with symbols, the ACE constraint table, slices N0N6 with gates and review assignments, and the landmine list. Read this before touching anything under `src/AcDream.Core.Net/`.
- [`docs/plans/2026-07-29-network-transport-campaign.md`](docs/plans/2026-07-29-network-transport-campaign.md) — Campaign N, the retail reliable-transport port — **CLOSED 2026-07-29, user-accepted** (#260 closed; a real wire loss recovered live during the acceptance session). Still the SSOT for the transport mechanism, the ACE constraint table, and the landmine list — read it (or `claude-memory/project_network_transport_digest.md`) before touching anything under `src/AcDream.Core.Net/`.
- [`docs/plans/2026-07-27-vulkan-campaign.md`](docs/plans/2026-07-27-vulkan-campaign.md) — Campaign V, OpenGL → Vulkan — **CLOSED 2026-07-29**; the completed record of the RHI contract, V0V11 slices, and the GL deletion. Historical reference for `src/AcDream.App/Rendering/`.
- [`docs/plans/2026-05-12-milestones.md`](docs/plans/2026-05-12-milestones.md) — milestone targets + freeze list per milestone
- [`docs/plans/2026-04-11-roadmap.md`](docs/plans/2026-04-11-roadmap.md) — what's shipped, what's in flight, what's next