docs(architecture): record pipeline-owned retirement

Close Slice 5F in the execution ledger, update the milestone and roadmap measurements, and advance the active checkpoint to direct cutover and dead-facade cleanup.

Co-authored-by: Codex <codex@openai.com>
This commit is contained in:
Erik 2026-07-21 22:09:16 +02:00
parent ea7ffbc186
commit 801d8a189c
4 changed files with 33 additions and 10 deletions

View file

@ -19,10 +19,13 @@ layer, the active structural prerequisite is the behavior-preserving
The 2026-07-21 audit baseline was 15,723 lines, 278 fields, and 205 methods.
Selection/interaction Slice 1, live-animation-presentation Slice 2, complete
live-session ownership Slice 3, and live-entity App integration Slice 4 are
complete. `GameWindow` is now 10,301 lines, 267 fields, and 163 methods. The
full Release suite passes 6,940 tests / 5 skips, and Slice 4's seven-destination
connected R6 route passed in 310 seconds. Slice 5 — landblock presentation —
is active next.
complete. Slice 5 landblock-presentation checkpoints AF are also complete:
the worker DAT transaction, render/physics/static publishers, and retryable
Near/full retirement now have focused owners. `GameWindow` is 9,011 lines,
down 1,290 from the Slice-5 baseline and 6,712 from the campaign baseline. The
full Release suite passes 7,039 tests / 5 skips; Slice 4's seven-destination
connected R6 route passed in 310 seconds. Slice 5G direct cutover and dead
facade/scratch cleanup is active next.
Carried:
#153 far-teleport residual, #116 slide-response, the remaining R6 ownership cleanup plus