docs(architecture): record pipeline-owned retirement

Close Slice 5F in the execution ledger, update the milestone and roadmap measurements, and advance the active checkpoint to direct cutover and dead-facade cleanup.

Co-authored-by: Codex <codex@openai.com>
This commit is contained in:
Erik 2026-07-21 22:09:16 +02:00
parent ea7ffbc186
commit 801d8a189c
4 changed files with 33 additions and 10 deletions

View file

@ -542,7 +542,11 @@ keeps a second identity dictionary. ForcePosition serializes and stamps one
exact canonical outbound Position. Three corrected-diff reviews, the complete
6,940-test Release suite, and the 310-second seven-destination connected R6
route all passed. `GameWindow` is 10,301 lines / 267 fields / 163 methods.
Slice 5 is active next.
Slice 5 checkpoints AF are complete. The pipeline owns the serialized worker
build, concrete render/physics/static publication, and retryable Near/full
retirement; `GameWindow.cs` is 9,011 lines and no longer owns a retirement
coordinator or callback body. Checkpoint G direct cutover/dead-facade cleanup
is active next, followed by deterministic and connected closeout in H.
#### Slice 5 — extract landblock presentation