From 78184941161e2c7dc197149f69b197ddf2729b99 Mon Sep 17 00:00:00 2001 From: Erik Date: Mon, 27 Jul 2026 00:12:26 +0200 Subject: [PATCH] docs(runtime): close the accepted J7 visual gate --- AGENTS.md | 20 ++++++++++++++----- CLAUDE.md | 20 ++++++++++++++----- docs/plans/2026-04-11-roadmap.md | 6 ++++-- docs/plans/2026-05-12-milestones.md | 5 +++-- .../2026-07-24-modern-runtime-architecture.md | 10 +++++++--- .../2026-07-25-modern-runtime-slice-j.md | 10 +++++----- .../2026-07-26-modern-runtime-slice-j7.md | 12 ++++++----- .../2026-07-26-modern-runtime-slice-j8.md | 8 ++++---- ...7-26-slice-j7-game-runtime-root-cutover.md | 12 ++++++----- 9 files changed, 67 insertions(+), 36 deletions(-) diff --git a/AGENTS.md b/AGENTS.md index d49ef1c7..f335fe81 100644 --- a/AGENTS.md +++ b/AGENTS.md @@ -340,8 +340,12 @@ Runtime owns the exact generation/cell-scoped host acknowledgement suffix and App owns only retryable graphical resource receipts. Its 365 Runtime tests, 3,716 App tests / 3 skips, 8,642 complete Release tests / 5 skips, and exact-binary lifecycle/reconnect route pass with every environment, -transit, and pending-host ledger at zero. J6 is complete; J7 composition-root -convergence is active. +transit, and pending-host ledger at zero. J6 is complete. J7.1 created the +single `GameRuntime` root at `96ddd165`; J7.2/J7.3 cut graphical production +and shutdown over at `ce41efb9`. Its 383 Runtime tests, 3,717 App tests / +3 skips, 8,661 complete Release tests / 5 skips, lifecycle/reconnect route, +canonical nine-stop route, and the user's 2026-07-27 exact post-cutover visual +matrix pass. J7 is closed; J8 no-window integration is active. J0's rollback is `git revert b632672e5ccabfb44c551e08f1c411ab2669c44a`. J1's rollback is @@ -392,6 +396,10 @@ J6.3's rollback is `git revert 6a063a27d4c805cd166d5a487afc290c34c400fd`. J6.4's rollback is `git revert 18d17d8bb17ed9ff3ed01da8273e2948abe6398b`. +J7.1's rollback is +`git revert 96ddd16539e670a5ce9b1f86677530e3fbc3f635`. +J7.2/J7.3's rollback is +`git revert ce41efb9e5938f79a7580476b949d172f52a1e69`. Slice H's retained UI/frame, bounded-light, and pooled/borrowed/direct network work is complete; the exact seven-checkpoint connected lifecycle/reconnect gate passes. Slice I is closed in @@ -417,8 +425,10 @@ closeout is `docs/research/2026-07-26-slice-j5-7-simulation-ownership-closeout.md`; J6.3 closeout is `docs/research/2026-07-26-slice-j6-3-teleport-correlation.md`; J6 closeout is -`docs/research/2026-07-26-slice-j6-4-host-acknowledgement.md`. The exact G4 -visual rollback +`docs/research/2026-07-26-slice-j6-4-host-acknowledgement.md`. J7 closeout is +`docs/research/2026-07-26-slice-j7-game-runtime-root-cutover.md`; J8 executes +from `docs/plans/2026-07-26-modern-runtime-slice-j8.md`. The exact G4 visual +rollback is `git revert ef1d263337997bb030eadb7b8e71d73dc659907a`; do not revert G3 or the portal-warmup corrections. Evidence: `docs/research/2026-07-25-slice-h-closeout.md` and @@ -457,7 +467,7 @@ uncapped Release presentation is smooth, while physics, collision, and wire truth remain correct. See `docs/plans/2026-07-22-gamewindow-slice-8-composition-lifecycle.md` and `docs/architecture/code-structure.md`. **Carried:** #153, #116, remaining -R6 ownership cleanup, TS-50/TS-51/TS-53, Modern Runtime Slice J7+, and #225's +R6 ownership cleanup, TS-50/TS-51/TS-53, Modern Runtime Slice J8+, and #225's lifestone/particle alpha visual gate. Start structural work at `memory/project_gamewindow_decomposition.md` and diff --git a/CLAUDE.md b/CLAUDE.md index 0be22b45..c90e684f 100644 --- a/CLAUDE.md +++ b/CLAUDE.md @@ -338,8 +338,12 @@ Runtime owns the exact generation/cell-scoped host acknowledgement suffix and App owns only retryable graphical resource receipts. Its 365 Runtime tests, 3,716 App tests / 3 skips, 8,642 complete Release tests / 5 skips, and exact-binary lifecycle/reconnect route pass with every environment, -transit, and pending-host ledger at zero. J6 is complete; J7 composition-root -convergence is active. +transit, and pending-host ledger at zero. J6 is complete. J7.1 created the +single `GameRuntime` root at `96ddd165`; J7.2/J7.3 cut graphical production +and shutdown over at `ce41efb9`. Its 383 Runtime tests, 3,717 App tests / +3 skips, 8,661 complete Release tests / 5 skips, lifecycle/reconnect route, +canonical nine-stop route, and the user's 2026-07-27 exact post-cutover visual +matrix pass. J7 is closed; J8 no-window integration is active. J0's rollback is `git revert b632672e5ccabfb44c551e08f1c411ab2669c44a`. J1's rollback is @@ -390,6 +394,10 @@ J6.3's rollback is `git revert 6a063a27d4c805cd166d5a487afc290c34c400fd`. J6.4's rollback is `git revert 18d17d8bb17ed9ff3ed01da8273e2948abe6398b`. +J7.1's rollback is +`git revert 96ddd16539e670a5ce9b1f86677530e3fbc3f635`. +J7.2/J7.3's rollback is +`git revert ce41efb9e5938f79a7580476b949d172f52a1e69`. Slice H's retained UI/frame, bounded-light, and pooled/borrowed/direct network work is complete; the exact seven-checkpoint connected lifecycle/reconnect gate passes. Slice I is closed in @@ -415,8 +423,10 @@ closeout is `docs/research/2026-07-26-slice-j5-7-simulation-ownership-closeout.md`; J6.3 closeout is `docs/research/2026-07-26-slice-j6-3-teleport-correlation.md`; J6 closeout is -`docs/research/2026-07-26-slice-j6-4-host-acknowledgement.md`. The exact G4 -visual rollback +`docs/research/2026-07-26-slice-j6-4-host-acknowledgement.md`. J7 closeout is +`docs/research/2026-07-26-slice-j7-game-runtime-root-cutover.md`; J8 executes +from `docs/plans/2026-07-26-modern-runtime-slice-j8.md`. The exact G4 visual +rollback is `git revert ef1d263337997bb030eadb7b8e71d73dc659907a`; do not revert G3 or the portal-warmup corrections. Evidence: `docs/research/2026-07-25-slice-h-closeout.md` and @@ -455,7 +465,7 @@ uncapped Release presentation is smooth, while physics, collision, and wire truth remain correct. See `docs/plans/2026-07-22-gamewindow-slice-8-composition-lifecycle.md` and `docs/architecture/code-structure.md`. **Carried:** #153, #116, remaining -R6 ownership cleanup, TS-50/TS-51/TS-53, Modern Runtime Slice J7+, and #225's +R6 ownership cleanup, TS-50/TS-51/TS-53, Modern Runtime Slice J8+, and #225's lifestone/particle alpha visual gate. Start structural work at `memory/project_gamewindow_decomposition.md` and diff --git a/docs/plans/2026-04-11-roadmap.md b/docs/plans/2026-04-11-roadmap.md index fb6b0dc7..0de0fad2 100644 --- a/docs/plans/2026-04-11-roadmap.md +++ b/docs/plans/2026-04-11-roadmap.md @@ -1,6 +1,6 @@ # acdream — strategic roadmap -**Status:** Living document. Updated 2026-07-26. **M3 landed; M4 is active.** M3's retail casting/UI, R6 locomotion/collision/projectile/teleport/radar rebaseline, deterministic fresh-login/portal world lifecycle, and final two-client portal observer flow are user-gated. All eight slices of the behavior-preserving ownership campaign in [`docs/architecture/code-structure.md`](../architecture/code-structure.md), their automated closeout, and the user's connected visual matrix are complete. Modern Runtime J3 canonical entity/object lifetime and J4 gameplay-state ownership are closed at `89e6b207`; J5.1 canonical selection/combat/target-mode ownership is closed at `b298f99f`, J5.2 interaction transactions at `f5f7b417`, J5.3 combat/magic intent at `20df9d15`, J5.4 local movement/outbound cadence at `aa3f4a60`, J5.5 per-session physics/remote simulation at `7e6033d0`, J5.6 projectile simulation at `2aee3356`, and J5.7 combined simulation closeout at `cdee7a4b`. J6.1 world-environment ownership is closed at `902076c0`; J6.2 canonical reveal generation and typed destination readiness is closed at `a6860d55` plus `acb845d8`; J6.3 exact F751/Position destination correlation is closed at `6a063a27`; J6.4 exact graphical-host acknowledgement and owner cleanup is closed at `18d17d8b`. J7 composition-root convergence is active. Issue #225's lifestone/particle alpha comparison remains a separate rendering visual gate. +**Status:** Living document. Updated 2026-07-27. **M3 landed; M4 is active.** M3's retail casting/UI, R6 locomotion/collision/projectile/teleport/radar rebaseline, deterministic fresh-login/portal world lifecycle, and final two-client portal observer flow are user-gated. All eight slices of the behavior-preserving ownership campaign in [`docs/architecture/code-structure.md`](../architecture/code-structure.md), their automated closeout, and the user's connected visual matrix are complete. Modern Runtime J3 canonical entity/object lifetime and J4 gameplay-state ownership are closed at `89e6b207`; J5.1 canonical selection/combat/target-mode ownership is closed at `b298f99f`, J5.2 interaction transactions at `f5f7b417`, J5.3 combat/magic intent at `20df9d15`, J5.4 local movement/outbound cadence at `aa3f4a60`, J5.5 per-session physics/remote simulation at `7e6033d0`, J5.6 projectile simulation at `2aee3356`, and J5.7 combined simulation closeout at `cdee7a4b`. J6.1 world-environment ownership is closed at `902076c0`; J6.2 canonical reveal generation and typed destination readiness is closed at `a6860d55` plus `acb845d8`; J6.3 exact F751/Position destination correlation is closed at `6a063a27`; J6.4 exact graphical-host acknowledgement and owner cleanup is closed at `18d17d8b`. J7's one graphical `GameRuntime` root is closed at `ce41efb9`, including the user's 2026-07-27 exact post-cutover visual acceptance. J8 no-window integration is active. Issue #225's lifestone/particle alpha comparison remains a separate rendering visual gate. **Purpose:** One source of truth for where the project is and where it's going. Every observed defect or missing feature has a named phase that owns it; when something looks wrong in-game, look here to find the phase that'll address it. Implementation details live in per-phase specs under `docs/superpowers/specs/`, not in this file. --- @@ -1796,7 +1796,9 @@ port in any phase — no separate listing here. > obligations and App owns only retryable graphical resource receipts. Its 365 > Runtime tests, 3,716 App tests / 3 skips, 8,642-test / 5-skip complete Release > suite, and exact-binary lifecycle/reconnect route pass with zero ownership -> debt at every checkpoint. J7 composition-root convergence is active. +> debt at every checkpoint. J7 completed at `ce41efb9`; the user accepted its +> exact post-cutover visual matrix on 2026-07-27. J8 no-window integration and +> Slice-J closeout are active. > The historical exact cutover > rollback remains > `git revert ef1d263337997bb030eadb7b8e71d73dc659907a`. Slice H is complete: diff --git a/docs/plans/2026-05-12-milestones.md b/docs/plans/2026-05-12-milestones.md index 344b19f2..7619f8a5 100644 --- a/docs/plans/2026-05-12-milestones.md +++ b/docs/plans/2026-05-12-milestones.md @@ -271,8 +271,9 @@ residency is `0/0/0` at every stable checkpoint and teardown converges. Slice I acknowledgement suffix while App owns only retryable resource receipts. Its 365 Runtime tests, 3,716 App tests / 3 skips, 8,642 complete Release tests / 5 skips, and exact-binary lifecycle/reconnect route pass with every - environment/transit/host ledger at zero. J7 composition-root convergence is - active under + environment/transit/host ledger at zero. J7 composition-root convergence + completed at `ce41efb9`; the user accepted its exact post-cutover visual + matrix on 2026-07-27. J8 is active under [`2026-07-25-modern-runtime-slice-j.md`](2026-07-25-modern-runtime-slice-j.md). Slice-I closeout evidence is [`../research/2026-07-25-slice-i7-closeout.md`](../research/2026-07-25-slice-i7-closeout.md). diff --git a/docs/plans/2026-07-24-modern-runtime-architecture.md b/docs/plans/2026-07-24-modern-runtime-architecture.md index 36d37a04..61a09574 100644 --- a/docs/plans/2026-07-24-modern-runtime-architecture.md +++ b/docs/plans/2026-07-24-modern-runtime-architecture.md @@ -23,8 +23,10 @@ physics/remote simulation (`7e6033d0`), projectile simulation (`2aee3356`), and the combined simulation ledger/Runtime-only closeout moved to Runtime. J6 completed at `18d17d8b`: Runtime owns world environment, canonical reveal generation/readiness, exact F751/Position destination correlation, and the -generation/cell-scoped graphical-host acknowledgement suffix. J7 -composition-root convergence is active. +generation/cell-scoped graphical-host acknowledgement suffix. J7 completed +at `ce41efb9` with its automated gates and the user's 2026-07-27 +physical-display acceptance. J8 no-window integration and Slice-J closeout are +active. **Scope:** Reconcile and sequence the existing Modern Pipeline (`MP`) and Linux/headless (`LH`) tracks using the 2026-07-24 connected performance audit. @@ -1301,7 +1303,9 @@ completed at `18d17d8b`: Runtime owns the exact outstanding graphical-host projection stages and App owns only retryable resource receipts. Its 365 Runtime tests, 3,716 App tests / 3 skips, 8,642-test / 5-skip complete Release suite, and exact-binary lifecycle/reconnect gate pass with zero ownership debt -at every stable checkpoint. J7 is the current execution point. +at every stable checkpoint. J7 completed at `ce41efb9`, and the user accepted +its exact post-cutover visual matrix on 2026-07-27. J8 is the current execution +point. Evidence: [`../research/2026-07-25-slice-g5-production-profile.md`](../research/2026-07-25-slice-g5-production-profile.md) and diff --git a/docs/plans/2026-07-25-modern-runtime-slice-j.md b/docs/plans/2026-07-25-modern-runtime-slice-j.md index 3dcd2ffa..3484bb6f 100644 --- a/docs/plans/2026-07-25-modern-runtime-slice-j.md +++ b/docs/plans/2026-07-25-modern-runtime-slice-j.md @@ -1,6 +1,6 @@ # Modern runtime Slice J — presentation-independent runtime -**Status:** J0–J5 COMPLETE; J6 ACTIVE +**Status:** J0–J7 COMPLETE; J8 ACTIVE **Parent:** `2026-07-24-modern-runtime-architecture.md`, Slice J **Authorization:** the user approved Slices F–L, including the otherwise-frozen Slice J gameplay-owner moves, on 2026-07-24 @@ -388,9 +388,9 @@ J7.1 completed at `96ddd165`; J7.2/J7.3 completed at `ce41efb9e5938f79a7580476b949d172f52a1e69`. Production now owns one `GameRuntime`, App borrows its children, and shutdown is one ordered root transaction. All focused, complete Release, exact-binary lifecycle/reconnect, -and canonical nine-stop automated gates pass. The physical-display visual gate -is active; J7 remains open until the user accepts radar, paperdoll, -Use/approach, combat facing, and both recall paths. Detailed evidence: +and canonical nine-stop automated gates pass. The user accepted radar, +paperdoll, near/distant Use, combat facing, and both recall paths on +2026-07-27; J7 is closed. Detailed evidence: [`2026-07-26-modern-runtime-slice-j7.md`](2026-07-26-modern-runtime-slice-j7.md) and [`../research/2026-07-26-slice-j7-game-runtime-root-cutover.md`](../research/2026-07-26-slice-j7-game-runtime-root-cutover.md). @@ -416,7 +416,7 @@ git revert ce41efb9e5938f79a7580476b949d172f52a1e69 **Detailed execution plan:** [`2026-07-26-modern-runtime-slice-j8.md`](2026-07-26-modern-runtime-slice-j8.md). -Implementation remains behind J7's active physical-display acceptance gate. +Implementation is active after J7's 2026-07-27 physical-display acceptance. - Build a transport/content test host that constructs Runtime directly. - Connect, enter world, receive chat/inventory/world updates, move, use, diff --git a/docs/plans/2026-07-26-modern-runtime-slice-j7.md b/docs/plans/2026-07-26-modern-runtime-slice-j7.md index 25691d86..1fbb55d3 100644 --- a/docs/plans/2026-07-26-modern-runtime-slice-j7.md +++ b/docs/plans/2026-07-26-modern-runtime-slice-j7.md @@ -158,8 +158,8 @@ host-lease debt. ### J7.4 — validation and closeout -**Automated portion complete 2026-07-26; physical-display visual acceptance -is active.** +**Complete 2026-07-27.** The automated gates and the exact post-cutover +physical-display visual matrix pass. - Focused Runtime and App tests. - Release solution build. @@ -193,9 +193,11 @@ Automated evidence: from 2,326.8 to 1,953.2 MiB while peak private bytes remain effectively flat at 1,732.1 MiB. - Captured physical-display login, facility-hub, Holtburg-after-dungeon, and - reconnect frames are intact. The live user gate covers radar, paperdoll, - near/distant Use, combat facing, `/ls`, spell recall, portal tunnel, and - portal exit before J7 is declared closed. + reconnect frames are intact. On 2026-07-27 the user accepted the exact + descendant Release build at source `456c7223`: world objects, radar blips and + coordinates, inventory paperdoll, near/distant Use and busy release, bow + combat facing, `/ls`, spell recall, portal tunnel, purple materialization, + and clean exit presentation all pass. - No AC behavior changed and the divergence audit found no new row to add. ## 5. Adversarial matrix diff --git a/docs/plans/2026-07-26-modern-runtime-slice-j8.md b/docs/plans/2026-07-26-modern-runtime-slice-j8.md index 576d82ad..9b77c239 100644 --- a/docs/plans/2026-07-26-modern-runtime-slice-j8.md +++ b/docs/plans/2026-07-26-modern-runtime-slice-j8.md @@ -1,6 +1,6 @@ # Modern runtime Slice J8 — no-window integration and Slice J closeout -**Status:** PLANNED — J7 PHYSICAL-DISPLAY ACCEPTANCE IS THE ENTRY GATE +**Status:** ACTIVE — J7 ENTRY GATE PASSED 2026-07-27 **Parent:** `2026-07-25-modern-runtime-slice-j.md`, J8 **Authorization:** the user approved Slices F–L, including the J gameplay-owner gates, on 2026-07-24 @@ -14,9 +14,9 @@ J7.1 created the root at `96ddd165`. J7.2/J7.3 cut the graphical host and shutdown transaction over to it at `ce41efb9e5938f79a7580476b949d172f52a1e69`. Focused, complete Release, connected lifecycle/reconnect, and canonical nine-stop automated gates pass. -J8 may begin production/test implementation only after the user accepts J7's -physical-display radar, paperdoll, Use/approach, combat-facing, and recall -matrix. +The user accepted J7's physical-display radar, paperdoll, Use/approach, +combat-facing, and both-recall matrix on 2026-07-27. J8 implementation may +begin from this accepted checkpoint. Existing direct tests prove the individual pieces, but not the complete root: diff --git a/docs/research/2026-07-26-slice-j7-game-runtime-root-cutover.md b/docs/research/2026-07-26-slice-j7-game-runtime-root-cutover.md index 38a4b9b4..cec2c755 100644 --- a/docs/research/2026-07-26-slice-j7-game-runtime-root-cutover.md +++ b/docs/research/2026-07-26-slice-j7-game-runtime-root-cutover.md @@ -3,8 +3,8 @@ **Production commit:** `ce41efb9e5938f79a7580476b949d172f52a1e69` -**Status:** automated gates complete; the physical-display visual gate is -active. +**Status:** COMPLETE — automated and physical-display gates passed +2026-07-27. ## Outcome @@ -73,8 +73,8 @@ load misses. ## Visual gate Captured physical-display login, facility-hub, Holtburg-after-dungeon, and -fresh reconnect frames are intact. Final acceptance remains the user's live -physical-display check of: +fresh reconnect frames are intact. On 2026-07-27 the user accepted the exact +post-cutover descendant Release build at source `456c7223`: - radar objects and coordinates; - inventory paperdoll; @@ -82,7 +82,9 @@ physical-display check of: - combat facing before bow fire; - `/ls` and spell-recall tunnel, materialization, and exit presentation. -J7 must not be declared closed until this live gate passes. +All checks passed: world objects, radar blips/coordinates, inventory +paperdoll, near/distant Use and busy release, combat facing before bow fire, +and both `/ls` and spell-recall tunnel/materialization/exit presentation. ## Retail and divergence audit