docs: morning gate G1 user-passed — AD-65 downhill slope feel accepted
'Slopes feels good' at the downhill/diagonal/jump-landing gate, on a launch whose capture self-verified the binary identity and the authored step heights. The overnight program's one owed visual gate is closed; Campaign S continues at S1B. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
This commit is contained in:
parent
d73125d3b0
commit
6b490aab8b
3 changed files with 3 additions and 5 deletions
File diff suppressed because one or more lines are too long
|
|
@ -4,7 +4,7 @@
|
|||
**Status:** IN FLIGHT — overnight session 2026-08-07 ledger:
|
||||
S1A (AP-157) closed by measurement, no code · S1B contract ready, not
|
||||
implemented · S2 contract ready, not implemented · S3 CANCELLED (planned on a
|
||||
misreading — see its section) · S4 half-landed (AD-65 shipped; AD-66 withheld
|
||||
misreading — see its section) · S4 half-landed (AD-65 shipped and USER-PASSED at the 2026-08-07 morning gate; AD-66 withheld
|
||||
behind #341's measurement anomaly; AD-69 filed) · S5 closed (fix predated the
|
||||
campaign; zombie register row) · S6 unstarted · #330 hoist landed, wiring
|
||||
withheld with a seven-point scope map · #32/#338 pre-work both closed.
|
||||
|
|
|
|||
|
|
@ -1,8 +1,6 @@
|
|||
# Morning gate — 2026-08-07 (one sitting)
|
||||
|
||||
**Status: READY — pending only the AD-65 review verdict and final commit,
|
||||
which the session lead completes before launch. Launch happens when you say
|
||||
go, not before.**
|
||||
**Status: COMPLETE 2026-08-07 — G1 user-passed ("Slopes feels good").**
|
||||
|
||||
Everything below folds the deferred visual gates into one sitting, ordered so
|
||||
travel between sites doubles as #339 reproduction attempts. Launch is
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue