docs(handoff): A6.P3 #98 — session paused after Shape 1 attempted + reverted
Updates ISSUES.md and CLAUDE.md to reflect the actual state of #98 after two days of work: - The new [step-walk-adjust] probe (8a232a3) + capture + findings (8daf7e7) prove AdjustOffset's slope projection is CORRECT. Sphere Z climbs monotonically 90.95 -> 92.80 across the ramp at +0.045 m mean zGain per call. The earlier "Fix targets 1-4" priority list is OBSOLETE — AdjustOffset is not the bug. - The climb caps at world Z ~= 92.80 because step-up's downward step-down probe finds no walkable within stepDownHeight=0.6 m below the proposed position. Cottage floor at Z=94 is ABOVE, not below. 101 stepdown-reject hits in the capture vs 1 acceptance. - Shape 1 fix attempted (0cb4c59): gated BSPQuery.AdjustSphereToPlane's two SetContactPlane call sites by Normal.Z >= 0.99 to match retail's cdb-observed flat-CP-only pattern. Reverted (402ec10) — gate broke OnWalkable tracking. 74% of new capture in falling state. User report: "can't get up the first step, jumped, stuck in falling animation." Either retail synthesizes a flat CP from sloped contacts (step_sphere_down:321203 path, unclear from BN decomp) or our OnWalkable tracking is over-coupled to ContactPlaneValid. Apparatus state: probe, findings, replay harness, plan, retail cdb capture all committed and ready for next session. Honest next-session moves (in order): 1. Build deterministic trajectory replay harness — 200ms inner loop instead of 5-minute live test. Issue98 cell fixtures are half of this already. 2. Pivot to less-coupled M1.5 issue while #98 awaits the harness. 3. Deeper named-decomp research on CEnvCell::find_env_collisions -> BSPTREE::find_collisions indoor CP-setting chain. Prior passes worked on the outdoor CLandCell path; indoor was never traced. NO further #98 fix attempts until apparatus or research has converged. Five+ failed attempts in the saga is the signal. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
parent
402ec10ec5
commit
5f3b64c548
2 changed files with 42 additions and 5 deletions
30
CLAUDE.md
30
CLAUDE.md
|
|
@ -764,11 +764,31 @@ divergence (low confidence).** Full divergence reading +
|
|||
fix-plan pickup prompt at
|
||||
[`docs/research/2026-05-23-a6-p3-issue98-replay-comparison.md`](docs/research/2026-05-23-a6-p3-issue98-replay-comparison.md).
|
||||
Current A6 phase:
|
||||
**A6.P3 — write evidence-driven fix plan against Target 1 or 2;
|
||||
NO speculative fixes (4 prior sessions guessed and were wrong).
|
||||
The replay harness ([`tests/AcDream.Core.Tests/Physics/Issue98CellarUpReplayTests.cs`](tests/AcDream.Core.Tests/Physics/Issue98CellarUpReplayTests.cs))
|
||||
is the test loop; a fix that doesn't change the failing assertions
|
||||
is not the fix.**
|
||||
**A6.P3 — PAUSED 2026-05-23 evening after two days of work.** The
|
||||
session shipped further apparatus + first failed fix attempt + revert:
|
||||
`8a232a3` (`[step-walk-adjust]` probe inside `Transition.AdjustOffset`
|
||||
revealing branch tokens and per-call zGain), `8daf7e7` (findings note
|
||||
at [`docs/research/2026-05-23-a6-stepwalkadjust-findings.md`](docs/research/2026-05-23-a6-stepwalkadjust-findings.md)
|
||||
+ capture snapshot), `0cb4c59` (Shape 1 fix: gate `BSPQuery.AdjustSphereToPlane`'s
|
||||
two `SetContactPlane` call sites by `Normal.Z >= 0.99`), `402ec10`
|
||||
(revert — Shape 1 broke OnWalkable tracking, sphere went into falling
|
||||
state on every sloped surface). **Refined diagnosis:** AdjustOffset is
|
||||
CORRECT (145/146 calls take `into-plane` branch, +0.045 m mean zGain
|
||||
per call when offset points into ramp); the climb CAPS at world Z ≈
|
||||
92.80 because step-up's downward step-down probe finds no walkable
|
||||
within 0.6 m below the proposed position (cottage floor is ABOVE).
|
||||
Earlier "Fix targets 1–4" priority list is OBSOLETE — AdjustOffset
|
||||
projection is not the problem. The actual bug is in the step-up
|
||||
validation at the ramp top. **Honest next-session moves**: (1) build
|
||||
deterministic trajectory replay harness so fix attempts iterate in
|
||||
<500ms instead of 5-minute live-test cycles; (2) pivot to a less-
|
||||
coupled M1.5 issue while #98 awaits the harness; (3) targeted decomp
|
||||
research on `CEnvCell::find_env_collisions` → `BSPTREE::find_collisions`
|
||||
indoor CP-setting chain (prior research worked on the outdoor
|
||||
`CLandCell` path; indoor was never fully traced). Session-end ISSUES.md
|
||||
entry has the full reading and pickup prompt. **NO further #98 fix
|
||||
attempts until apparatus or research has converged — five+ failed
|
||||
attempts in the saga is the signal.**
|
||||
Findings doc:
|
||||
[`docs/research/2026-05-21-a6-cdb-capture-findings.md`](docs/research/2026-05-21-a6-cdb-capture-findings.md).
|
||||
Original demo scenario (Holtburg Sewer end-to-end) is unreachable: sewer
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue